Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Appendix J - Civil Engineering Report and SBSMP

of 86

Page text read automatically using OCR, there may be inaccuracies

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                             ACCEPTABLE OUTCOMES                                           COMMENTS




 PO11                                                             AO11.1
                                                                                                                                N/A Natural channel (gully) already
 Water sensitive urban design principles are applied to           The design and construction of a natural channel or natural
 achieve multifunctional design of waterways, wetlands and                                                                      exists no new channels natural
                                                                  channel rehabilitation works are in accordance with the
 drainage lines that provide for:                                 Natural Channel Design Guidelines (Brisbane City              channel or natural channel
          1. stormwater conveyance that uses natural                                                                            rehabilitation works are proposed.
              channel design;
                                                                  Council) having regard to local topography, geology and
          2. protection of landscape features and ecological      geomorphology.
              important areas including terrestrial and aquatic   AO11.2                                                        To be complied with at detailed
              habitat;                                            Landscape features, plant species and habitat types used      design / construction stages.
          3. aesthetic and passive recreation values;             in stormwater conveyance channels are complementary to
          4. flood management and conveyance of external          the local context and natural waterways.
              catchment stormwater through the                    AO11.3                                                        To be complied with at detailed
              development;                                        Bank and bed stability and planting densities result in a     design / construction stages.
          5. landscaping that incorporates local native           stable channel over the long term and minimal potential
              species; and                                        for pest plant species.
          6. bed and bank stability.                              AO11.4
                                                                                                                                Development Complies, Water
                                                                  Water Sensitive Design measures are incorporated into the
                                                                                                                                Sensitive Design measures were
                                                                  development, as detailed in the document Water Sensitive
                                                                  Designs small improvements, new ideas, concepts and           incorporated in the SBSMP.
                                                                  sketch designs for stormwater filtration systems (Healthy
                                                                  Waterways Water by Design).
                                                                  AO11.5
                                                                                                                                N/A Noosa Shire Council mapping
                                                                  Floodplain management is designed in accordance with
                                                                                                                                indicates that no flood plains are
                                                                  the Framework for the Integration of Flood




Page 7 of 11
June 2021

Log in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.