Appendix J - Civil Engineering Report and SBSMP
Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
and Stormwater Management into Open Space published located within the development
by Healthy Waterways Water by Design (version current at area.
the time of development application).
PO12 AO12.1 Development will comply, pre-
Development protects in-stream ecology by maintaining Where run-off from or within the site passes through or development low flows will be
pre-development low flow discharge regimes and drains to natural channels, waterways or wetlands, maintained in accordance with the
maintaining fish passages. development protects in-steam ecology by maintaining
frequent flow management
pre-development low flow discharge regimes in
objectives in PSP6 Engineering
accordance with the frequent flow management objectives
in PSP6 Engineering Design Standards - Roads, drainage Design Standards - Roads,
and earthworks drainage and earthworks
AO12.2 N/A no instream structure are
Instream structures such as roads, bridges, culverts, and proposed within this SBSMP
other stormwater infrastructure do not cause barriers to prepared by this office.
fish passage and facilitate the movement of terrestrial and
aquatic fauna along waterway corridors.
AO12.3 Development will comply.
Benthic substrate retains a continuous grade with the
direction of flow consistent with the natural bed profile.
PO13 AO13.1 To be complied with at detailed
Development is designed and constructed to maintain The location and form of stormwater discharge points do design / construction stages.
surface and ground water balances that sustain the not alter the pre-development hydrology of receiving
environmental values of water dependent ecosystems, surface water or groundwater.
Page 8 of 11
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.