Original source · versioned page text
Appendix J - Civil Engineering Report and SBSMP.pdf
E X SW
DN150 GIBAULT
R
ATE
EXISTING DN150 oPVC
DN150 CONNECTOR (FL-FL) + BLANK END
YW
PN16 WM DN150 DI PN35 WS
NIT
WITH BSP TAP
U
BY
DN150 VALVE (FL-FL)
KS
OR
EW
DN150 TEE (SOC-SOC-FL)
L IV
DN150 11.25° BEND (SOC-SOC)
DN150 CONNECTOR (FL-SP)
DN150 VALVE (FL-FL)
DN150 GIBAULT
DN250x150 OFFTAKE (FLANGED)
EX
FO
EX SW
O
EX
TP
A
KE
TH
R DN150 oPVC PN16 WM
B
LIV
EW EX DN250 WATERMAIN
OR
KSB
DN150 GIBAULT YU
NIT
YW
ATE
DN150 CONNECTOR (FL-SP) R
DN150 THRUST RESTRAINT 600mm LONG (FL-FL) CONTRACTOR
CONTRACTOR CONNECTION DETAIL M
REFER TO DRAWING 1856-W09 ALL THRUST BLOCKS TO
OD180 STUB FLANGE WITH EF COUPLING
ALL THRUST BLOCKS TO SCALE 1:40 (A3) BE IN ACCORDANCE
BE IN ACCORDANCE 0 0.4 0.8 1.2 1.6 2.0m
0 0.4 0.8 1.2 1.6 2.0m OD180 PE100 PN16 WM WITH SEQ-WAT-1205-1 & CONNECTION DETAIL N
WITH SEQ-WAT-1205-1 & SEQ-WAT-1206-1
REFER TO DRAWING 1856-W10
SEQ-WAT-1206-1
BD
SCALE 1:40 (A3) SCALE 1:40 A3
SCALE 1:40 A3
Y
TH
PA
ERB
WK
OT
NE
FO
W
NE
RB
TH
TH
KE
TPA
OD180 PE100 PN16 WM OO
RB
PA
WF
W
NE TH
KE
OT
TPA
NE
OO
WF
FO
W
OD180 STUB FLANGE NE
NE
W
WITH EF COUPLING
NE
OD180 PE100 PN16 WM
DN150 THRUST RESTRAINT
600mm LONG (FL-FL)
DN150 VALVE (FL-FL)
DN150 TEE (FL-FL-FL)
TH
TPA OD180 STUB FLANGE WITH 90°
DN150 VALVE (FL-FL) OO
NE WF BEND WITH EF COUPLINGS
DN150 THRUST RESTRAINT WITH BLANK END
600mm LONG (FL-FL)
OD180 PE100 PN16 WM DN150 THRUST RESTRAINT 600mm LONG (FL-FL)
RY
DN150 VALVE (FL-FL) DA
OD180 STUB FLANGE UN
OD180 STUB FLANGE BO
OD180 PE100 PN16 WM WITH EF COUPLING
Y
WITH EF COUPLING
AR
DN150x100 TEE
D
DN150 THRUST RESTRAINT
UN
WITH FH (FL-FL)
600mm LONG (FL-FL)
BO
CONNECTION DETAIL K
CONTRACTOR REFER TO DRAWING 1856-W07 CONTRACTOR
SCALE 1:40 (A3)
ALL THRUST BLOCKS TO ALL THRUST BLOCKS TO
BE IN ACCORDANCE 0 0.4 0.8 1.2 1.6 2.0m CONNECTION DETAIL L 0 0.4 0.8 1.2 1.6 2.0m
BE IN ACCORDANCE
WITH SEQ-WAT-1205-1 & WITH SEQ-WAT-1205-1 & REFER TO DRAWING 1856-W07
SEQ-WAT-1206-1 SEQ-WAT-1206-1 SCALE 1:40 (A3) SCALE 1:40 A3
SCALE 1:40 A3
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD DRAWN
I GDETAL
IS SCALE APPROVED PROPOSED SUBDIVISION 1856
08-02-21 FOR CONSTRUCTION JP TS AT NOOSA CIVIC, WALTER HAY DRIVE
B 27-11-20 REVISED AS PER COUNCIL RFI MEETING MM CL DATUM AHD SHEET: 15 OF 17
FOR STOCKWELL PTY LTD
C 08-02-21 FOR CONSTRUCTION JP TS DESIGN MM
AS SHOWN
................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN MM Director: CAMERON LANDRETH
DESIGN CHECK (RPEQ 19358) p 07 5443 8285 WATERMAIN CONNECTION DETAIL PLAN W15 C
CL
e [email protected] w www.barlowshelley.com.au
DATE 18-03-20
This drawing is not to be copied or amended without written permission from
Barlow Shelley Consulting Engineers FOR CONSTRUCTION a PO Box 899, Maroochydore,4558 ABN 89 215 591 077 SHEET 4 OF 5
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.