Original source · versioned page text
Appendix J - Civil Engineering Report and SBSMP.pdf
PATH
DARY
EX FOOT
BOUN
PATH
EX FOOT
EX STORMWATER
EX BITUMEN
EX KERB
OD180 STUB
DN150 OFFTAKE (FLANGE) FLANGE WITH EF
DN150 VALVE (FL-FL)
DN150 CONNECTOR (FL-FL) + BLANK END
LIVE WORK BY UN
WITH BSP TAP
NEW OD180 PE100 PN16 WM
DN150 DUCK
FOOT FH DN150 THRUST
ITYWATER
RESTRAINT 600mm LONG
DN150 VALVE
DN150 FH
EX FOOTPATH
(SOC-SOC)
BOU
(FL-FL)
NDA
Y R
EX FOOTPATH
CONTRACTOR
ALL THRUST BLOCKS TO
BE IN ACCORDANCE 0 0.4 0.8 1.2 1.6 2.0m
WITH SEQ-WAT-1205-1 & CONNECTION DETAIL O 0 0.4 0.8 1.2 1.6 2.0m CONNECTION DETAIL P
SEQ-WAT-1206-1 REFER TO DRAWING 1856-W04 & W10
REFER TO DRAWING 1856-W11
SCALE 1:40 (A3) SCALE 1:40 A3
SCALE 1:40 (A3) SCALE 1:40 A3
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD DRAWN
I GDETAL
IS SCALE APPROVED PROPOSED SUBDIVISION 1856
A 18-03-20 FOR APPROVAL MM CL AT NOOSA CIVIC, WALTER HAY DRIVE
B 27-11-20 REVISED AS PER COUNCIL RFI MEETING MM CL DATUM AHD SHEET: 16 OF 17
FOR STOCKWELL PTY LTD
C 08-02-21 FOR CONSTRUCTION JP TS DESIGN MM
AS SHOWN
................. DRAWING NUMBER REV
DRAWING TITLE:
DRAWN MM Director: CAMERON LANDRETH
DESIGN CHECK (RPEQ 19358) p 07 5443 8285 WATERMAIN CONNECTION DETAIL PLAN W16 C
CL
e [email protected] w www.barlowshelley.com.au
DATE 18-03-20
This drawing is not to be copied or amended without written permission from
Barlow Shelley Consulting Engineers FOR CONSTRUCTION a PO Box 899, Maroochydore,4558 ABN 89 215 591 077 SHEET 5 OF 5
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.