Decision Notice - 010.2009.00001508.001 [As Published] · 142009.1508

of 7

Text shows just the words. Original shows the document exactly as it was published.

                                              Officer:          Ron Read
                                              Direct Telephone: (07) 5449 5263
                                              Response Address: Locked Bag 72
                                                                Sunshine Coast Mail Centre QLD 4560
                                              Email:            [email protected]
                                              Our Reference:    2009/1508
                                              Your Reference:


1 December 2009

Warick Paul Redwood
4 Wildflower Street
SUNSHINE BEACH QLD 4567



Dear Sir

                                       Decision Notice
                                   Integrated Planning Act 1997

I refer to your application and advise that on 1 December 2009 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:

1        APPLICATION DETAILS

    Application No:                  2009/1508
    Street address:                  102 Pacific Avenue SUNSHINE BEACH
    Real property description:       LOT: 163 RP: 897370
    Planning Scheme:                 The Noosa Plan

2        DECISION DETAILS
The following type of approval has been issued:
        Development Permit for Operational Works - Landscaping, Stormwater, S&E Control,
         Carparking & Access, Frontage Works

3        RELEVANT PERIOD OF APPROVAL
This Development Permit lapses if the development has not happened by 1 December 2011 unless
application to extend the relevant period is approved by Council.

4        ASSESSMENT MANAGER CONDITIONS

1.       The development shall be carried out in accordance with the approved plans listed below or as
         modified herein.
2.       Copies of the above mentioned approved plans, duly signed by the consultant Registered
         Professional Engineer of Queensland (RPEQ) shall be provided to Council’s Construction
         Technical Officer at the “pre start” meeting.
3.       Roof and surface runoff connection to Council’s drainage system shall be as shown on Spice
         Consulting drawing 895-01A.

                                                                                         Page 1 of 7
Full text of the other 6 pages

Page 2

                                                                                     2009/1508



4.    Prior to construction of the northern driveway, Council’s Construction Technical Officer shall
      be provided with a letter from TELSTRA confirming that they have no objection to that
      driveway being located adjacent to the Telstra Manhole.
5.    Road-edge yellow line marking between the proposed driveways shall be provided to prohibit
      parking. This line marking shall be provided in accordance with the Manual of Uniform Traffic
      Control Devices. (Condition 21 of Decision Notice 2007/2446 refers).
6.    Prior to the commencement of works, the applicant shall comply with the requirements of the
      Building Construction Industry (Portable Long Service Leave) Act 1991. In this regard, a
      Statutory Declaration outlining the cost of building and construction works, as defined in sec
      73 (1) of the Act shall be provided, together with a copy of the receipt for payment of the
      prescribed levy amount. This receipt shall be provided to Council’s Construction Technical
      Officer at the pre-start meeting.
7.    A Traffic Management Plan (TMP) for the development addressing all construction phases
      shall be prepared by suitably qualified persons and submitted to Council for approval prior to
      the pre start meeting. The TMP shall address, but not be limited to, all items listed below and
      shall be flexible in that it addresses all stages of the development.
      a.    A single nominated access location to and from the site.
      b.    The plan should detail the routing of trucks to and from the site.
      c.    Provision of onsite parking for personnel working on this development, as there is
            limited parking available in adjacent streets.
      d.    Provision of safe cycle and pedestrian movements in the vicinity of the development.
      e.    No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
            Further parked trucks must have engines turned off.
      f.    Provision of signage and traffic controllers in accordance with Manual of Uniform Traffic
            Control Devices and the Transport Infrastructure (Roads) Act.
      g.    Provide an indication where the surplus spoil is to be transported to, and/or source of
            imported fill material.
8.    To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
      the driveway and any associated landscaping and fencing shall comply with the minimum
      sight-line requirements provided in AS 2890.1 section 3.2.4. This applies to both Entering
      Sight Distance and Sight Distance to Pedestrians. (Condition 42 of Decision Notice
      2007/2446 refers).
9.    Prior to the construction of the proposed stormwater drainage for this development, evidence
      is to be provided to Council’s Construction Technical Officer that there is no net increase in
      stormwater runoff from the site. (Condition 26 of Decision Notice 2007/2446 refers).
10.   All landscaping is to be constructed in accordance with Council’s Planning Scheme Policy
      PSP03 Landscaping Plants and Guidelines, the approved landscape plan, the Planting
      Schedule received 20 Nov 2009 and horticultural best practices.
11.   All trees must be placed a minimum of one (1) metre from all services.
12.   Suitable root barriers shall be installed where proposed trees are adjacent to paths, pavement,
      etc; in accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and
      Guidelines.
13.   Council’s Construction Technical Officer (phone 0439 717 952) shall be given seven (7) days’
      notice of intention to commence works to arrange a “pre start” meeting prior to the
      commencement of those works.



                                                                                    Page 2 of 7

Page 3

                                                                                        2009/1508



14.   The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to ensure
      that any subcontractors also have the appropriate insurance and public liability documentation.
15.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy
      of Council’s signed approved drawings and conditions by the applicant.
16.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
      project. (This person will be the contact for the project).
17.   Council standards shall apply to these works unless otherwise modified herein.
18.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply,
      sewerage, footpaths, kerbing, landscaping, street furniture, etc.) are protected against any
      damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify Council’s CEO and shall forthwith rectify the damage to that property or facility
      at its cost and to the satisfaction of Council’s CEO.
      All rectification works are to be completed prior to the commencement of the use or,
      alternatively, the Applicant may request Council to carry out the rectification work at the
      Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement
      of the use.
      In the case of any emergency, Council shall be entitled to rectify such damage at the cost of
      the Applicant, such cost being paid prior to the commencement of the use.
19.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
20.   Construction work and other associated activities are permitted only during the hours of 7.00
      am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
      except where extended hours are approved by Council’s CEO.
21.   All signage, including that for safety during construction, shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
22.   Safe pedestrian access in the vicinity of the development shall be maintained at all times. If
      footpath / road closures are necessary to carry out construction works, Council’s Construction
      Technical Officer (phone 0439 717 952) must be notified prior to the proposed closure.
23.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, “on the spot “ fines may be issued. Such
      fines can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways. Although the sediment and erosion control
      measures have been approved, it is the site Supervising Engineer who is responsible for
      ensuring that the sediment and erosion control measures have:
      i.     been duly designed and constructed in accordance with “best practise” methods,
      ii.    been revised to address the issues raised by any changes to the projected construction
             schedule and/or methods,
      iii.   been revised to address any predicted rainfall events, and
      iv.    achieved the desired environmental outcomes.
      Sunshine Coast Regional Council’s CEO may request further controls to be installed should
      approved measures be inefficient.
                                                                                       Page 3 of 7

Page 4

                                                                                         2009/1508



24.   The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant
      traps in accordance with the manufacturers specifications. The owners of the subject property
      shall inspect the gross pollutant traps on a weekly basis and after each storm event.
      Further, the owners of the subject property shall enter into an ongoing maintenance contract
      with a Registered Contractor to clean and maintain the gross pollutant traps on regular three
      monthly cycles and on an “On Call” basis in the case of an emergency.
      The management and maintenance of the gross pollutant traps shall be included in the
      Community Management Scheme for the completed development.
25.   These works are also to be in compliance with the relevant conditions of Development Permit
      No. 2007/2446.
26.   Notwithstanding that Council has checked the plans with due care, where it is found during
      construction that variations from Council's standards exist, then Council standards shall apply.

5     REFERRAL AGENCY CONDITIONS
Not Applicable.

6     APPROVED PLANS
The approved plans for this development approval are listed in the following table:

 Plan No.             Re     Plan Name                                                 Date
                      v.
 09-801               P3     Landscape Plan and associated Plant Schedule              19/11/09
 895-SWM1             A      Site Stormwater Management (by Spice Consulting)          18/09/09
 895-ESC1             A      Sediment & Erosion Control (by Spice Consulting)          18/09/09
 29065 – S1           A      Car Park Details (by Rienmac)                             17/09/09
 895-01               A      Site & Ground Floor Services (by Spice Consulting)        18/09/09

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    Should any changes or modifications to the approved plans be required as a result of
      construction constraints, a “Request to change an existing approval” (Form 2 Development
      Application) under the Integrated Planning Act 1997 must be made. Amended plans clearly
      indicating the changes must be lodged with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

                                                                                        Page 4 of 7

Page 5

                                                                                     2009/1508



8     PROPERTY NOTES
Not Applicable.

9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not Applicable.
10    FURTHER DEVELOPMENT PERMITS REQUIRED

Not Applicable.

11    SELF ASSESSABLE CODES
Not Applicable.

12    SUBMISSIONS

Not Applicable.
13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not Applicable.

14    RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15    OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully




JEFF FANTON
COORDINATOR - CIVIL ENGINEERING
OPERATIONAL WORKS ASSESSMENT BRANCH




                                                                                    Page 5 of 7

Page 6

                                                                                                      2009/1508



                                                        Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated
                                                                    (6) If an application involves assessment against a
Planning Act (Chapter 4).                                      concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to                      for the application are not available against the part of
development applications                                       the approval that represents the concurrence agency’s
                                                               response for the code.
Appeals by applicants
                                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following-          4.1.29.(1) An advice agency may, within the limits of
                                                               its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development      development approval for a development application
      application;                                             if-
(b) a matter stated in a development approval,                 (a) the development application involves impact
      including any condition applying to the                      assessment; and
      development, and the identification of a code
      under section 3.1.6;1                                    (b) the advice agency told the applicant and the
                                                                  assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a            application as a submission for an appeal.
      development permit was applied for;
                                                                  (2) The appeal must be started within 20 business
(d) the length of a relevant period;                           days after the day the decision notice or negotiated
(e) a deemed refusal.                                          decision notice is given to the advice agency as a
   (2) An appeal under subsection (1)(a) to (d) must           submitter.
be started within 20 business days (the “applicant’s           Appeals for matters arising after approval given
appeal period”) after the day the decision notice or           (co-respondents)
negotiated decision notice is given to the applicant.          4.1.30.(1) For a development approval given for a
    (3) An appeal under subsection (1)(e) may be               development application, a person to whom any of the
started at any time after the last day a decision on the       following notices have been given may appeal to the
matter should have been made.                                  court against the decision in the notice-
Appeals by submitters                                          (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application               extension of the relevant period for an approval;
may appeal to the court about-                                 (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including                minor change to an approval.
      any conditions (or lack of conditions) or other              (2) The appeal must be started within 20 business
      provisions of the approval; or                           days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval.          the person.
    (2) The appeal must be started within 20 business                (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day            approval resulted from a development application
the decision notice or negotiated decision notice is           (superseded planning scheme) that was assessed as
given to the submitter.                                        if it were an application under a superseded planning
                                                               scheme.
   (3) If a person withdraws a submission before the
application is decided, the person may not appeal the             (4) Also, a person who has made a request
decision.                                                      mentioned in subsection (1) may appeal to the court
                                                               against a deemed refusal of the request.
   (4) If an application involves both impact
assessment and code assessment, appeal rights for                 (5) An appeal under subsection (4) may be started
submitters are available only for the part of the              at any time after the last day the decision on the
application involving impact assessment.                       matter should have been made.
    (5) If an application is processed under section           Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the                Appeals for matters arising after approval given
application are available only for the aspects of the          (no co-respondents)
development that would have required public
notification under the repealed Act.                           4.1.31.(1) A person to whom any of the following
                                                               notices have been given may appeal to the court
                                                               against the decision in the notice-
                                                               (a) a notice giving a decision on a request to change
a.                                                                 or cancel a condition of a development approval.
1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                                     Page 6 of 7

Page 7

                                                                                                   2009/1508

(b) a notice under section 6.1.442 giving a decision to     (d) the length of a period mentioned in section 3.5.21
     change or cancel a condition of a development                relevant period;
     approval.                                              (e) a deemed refusal.
    (2) The appeal must be started within 20                    (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision      be started within 20 business days (the “applicant’s
is given to the person.                                     appeal period”) after the day the decision notice or
   (3) Also, a person who has made a request                negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the                (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request.              started at any time after the last day a decision on the
    (4) An appeal under subsection (3) may be               matter should have been made.
started at any time after the last day the decision on      The Registrar for the Building and Development
the matter should have been made.                           Tribunal may be contacted at the website
Appeals against decisions to change approval                http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
                                                            For Infrastructure Charges Only
decision made on an application to change the               4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under              charges
section 2.19(3)or section 4.4 of the repealed Act may       (1) This section applies to a person who has been
appeal to the court against-                                given, and is dissatisfied with, an infrastructure
(a) the decision; or                                        charges notice or a regulated State infrastructure
(b) a deemed refusal of the application.                    charges notice.
    (2) An appeal under subsection (1)(a) must be           (2) The person may appeal to the court against the
started within 20 business days after the day notice of     notice.
the decision is to be given to the person.                  (3) The appeal must be started within 20 business
    (3) An appeal under subsection (1)(b) may be            days after-
started at any time after the last day a decision on the    (a) if the notice is given because of a development
matter should have been made.                                    approval or master plan approval-the day the
Appeals against local laws                                       applicant is given notice of the decision about the
                                                                 approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions            (b)    otherwise-the day the notice is given to the
applied under a local law about the use of premises or             person.
the erection of a building or other structure permitted     (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court              (a) whether a charge in the notice is so
against the decision or the conditions applied.                  unreasonable that no reasonable relevant local
    (2) The appeal must be started within 20 business            government, State infrastructure provider or
days after the day notice of the decision is given to the        coordinating agency could have imposed it; or
applicant.                                                  (b) an error in the calculation of the charge.
For Building Works Only                                     (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the          appeal under this section can not be about the
Integrated Planning Act 1997 as follows:                    methodology used to establish the charge in the
                                                            relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
                                                            State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
     application;
(b) a matter stated in a development approval,
     including any condition applying to the
     development, and the identification of a code
     under section 3.1.6;3
(c) the decision to give a preliminary approval when a
     development permit was applied for;

a.
2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
   Section 3.1.6 (Preliminary approval may override
  local planning instrument)
                                                                                                 Page 7 of 7

Used in these records

About this file

File size
58 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2009.00001508.001 [As Published].pdf · 58 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.