Council archive · source document
Decision Notice - 010.2009.00001508.001 [As Published] · 142009.1508
2009/1508
4. Prior to construction of the northern driveway, Council’s Construction Technical Officer shall
be provided with a letter from TELSTRA confirming that they have no objection to that
driveway being located adjacent to the Telstra Manhole.
5. Road-edge yellow line marking between the proposed driveways shall be provided to prohibit
parking. This line marking shall be provided in accordance with the Manual of Uniform Traffic
Control Devices. (Condition 21 of Decision Notice 2007/2446 refers).
6. Prior to the commencement of works, the applicant shall comply with the requirements of the
Building Construction Industry (Portable Long Service Leave) Act 1991. In this regard, a
Statutory Declaration outlining the cost of building and construction works, as defined in sec
73 (1) of the Act shall be provided, together with a copy of the receipt for payment of the
prescribed levy amount. This receipt shall be provided to Council’s Construction Technical
Officer at the pre-start meeting.
7. A Traffic Management Plan (TMP) for the development addressing all construction phases
shall be prepared by suitably qualified persons and submitted to Council for approval prior to
the pre start meeting. The TMP shall address, but not be limited to, all items listed below and
shall be flexible in that it addresses all stages of the development.
a. A single nominated access location to and from the site.
b. The plan should detail the routing of trucks to and from the site.
c. Provision of onsite parking for personnel working on this development, as there is
limited parking available in adjacent streets.
d. Provision of safe cycle and pedestrian movements in the vicinity of the development.
e. No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
Further parked trucks must have engines turned off.
f. Provision of signage and traffic controllers in accordance with Manual of Uniform Traffic
Control Devices and the Transport Infrastructure (Roads) Act.
g. Provide an indication where the surplus spoil is to be transported to, and/or source of
imported fill material.
8. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
the driveway and any associated landscaping and fencing shall comply with the minimum
sight-line requirements provided in AS 2890.1 section 3.2.4. This applies to both Entering
Sight Distance and Sight Distance to Pedestrians. (Condition 42 of Decision Notice
2007/2446 refers).
9. Prior to the construction of the proposed stormwater drainage for this development, evidence
is to be provided to Council’s Construction Technical Officer that there is no net increase in
stormwater runoff from the site. (Condition 26 of Decision Notice 2007/2446 refers).
10. All landscaping is to be constructed in accordance with Council’s Planning Scheme Policy
PSP03 Landscaping Plants and Guidelines, the approved landscape plan, the Planting
Schedule received 20 Nov 2009 and horticultural best practices.
11. All trees must be placed a minimum of one (1) metre from all services.
12. Suitable root barriers shall be installed where proposed trees are adjacent to paths, pavement,
etc; in accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and
Guidelines.
13. Council’s Construction Technical Officer (phone 0439 717 952) shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of those works.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2009.00001508.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 58 KB (small file)
- File type
No other editions are linked here.