Decision Notice - 010.2008.00000744.001 [As Published] · 142008.744

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                              Officer:          Glen Conforti
                                              Direct Telephone: (07) 5449 5379
                                              Response Address: PO Box 141, Tewantin QLD 4565
                                              Email:            [email protected]
                                              Our Reference:    2008/744
                                              Your Reference:
6 August 2008

Vynara Pty Ltd
CARE Greg Gibbs Architects
PO Box 1272
NOOSA HEADS QLD 4567




Dear Sir

                                      Decision Notice
                                    Integrated Planning Act 1997

I refer to your application and advise that on 5 August 2008 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
1        APPLICATION DETAILS

    Application No:                  2008/744
    Street address:                  5 Bluefin Court, Noosaville
    Real property description:       Lot 2 RP 906991
    Planning Scheme:                 The Noosa Plan

2        DECISION DETAILS

The following type of approval has been issued:
        Development Permit for Operational Works - Landscaping, Stormwater, Carparking, Access,
         Frontage Works, Stormwater Disposal & Sediment & Erosion Control

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4        ASSESSMENT MANAGER CONDITIONS

Landscaping
1.       The site is to be landscaped in accordance with Council’s Landscaping Code and Planning
         Scheme Policy PSP3 on Landscaping Plants and Guidelines and the approved plan of
         development. The approved plan is numbered:
          Plan         /     Rev.    Plan / Document Name                                      Date
          Document No.
          0885 WD24                  Landscaping Plan – Greg Gibbs Architects                  April 2008

                                                                                           Page 1 of 8
Full text of the other 7 pages

Page 2

                                                                                       2008/744



      and including annotations made on the plan.
2.    All manholes, inspection pits and grates are to be raised to finished surface levels and kept
      free of cover and visible at all times to ensure prompt access in an emergency.
3.    The landscape construction is to be implemented in accordance with the amended landscape
      plan, planting schedule and horticultural industry best practices.
4.    All trees must be planted a minimum of 1 metre from all services.
5.    All trees 45 litres or greater must be securely staked and tied to assist growth during
      establishment period.
6.    The Body Corporate of the development is responsible for the ongoing maintenance of
      landscaping within the front road reserve.
7.    Additional ground covers shall be provided to the understorey of the two (2) Syzygium
      Paniculata within the waste bin garden beds.
8.    Provide two (2) Syzygium Cascades to the understorey of each Archontophoenix
      Cunninghamia as additional screening.
9.    This Development Permit lapses if the development has not happened by 5 August 2010,
      unless application to extend the currency is approved by Council.
Frontage Works, Access, Car Parking, Stormwater Disposal, Sediment & Erosion Controls and
Filling of the Site.
10.   The development shall be carried out in accordance with the approved plans listed
      below or as modified herein.
      Plan         /      Rev.     Plan / Document Name                                  Date
      Document No.
      18095-OW1           .        Operational Works Plan (Sediment & Erosion            April 2008
                                   Control Plan) – SCG Consulting Engineers
      1874-2              B        Ground Hydraulic Services (Stormwater Disposal        2 July 2008
                                   Plan) – Construction Hydraulic
      0885 WD02                    Site Plan (Access & Footpath Detail Plan) – Greg      April 2008
                                   Gibbs Architects

11.   Roof and surface runoff connection to Council’s kerb and channel in Bluefin Court shall be as
      shown on drawing No. 1874-2B by Constuction Hydraulics dated 2 July 2008. Kerb adaptors
      shall be used in the kerb.
12.   A footpath 1.5 metres wide shall be constructed across the full frontage of the development.
      The footpath shall have a slip resistant surface. The alignment of which shall be determined
      on site with Council’s Construction Technical Officer. The expansion joints in any
      bikeway/footpath shall be “sawcut” not trowel jointed.
13.   Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
      installed into the first existing external downstream stormwater structure. These devices are to
      be checked and cleaned on a regular basis and specifically after each rain event.
      These devices are to remain in place during the civil works and construction phases of the
      development.

      The location and type of device to be installed shall be established at the “pre start” meeting
      with Council’s Construction Technical Officer and shall be installed prior to the
      commencement of any works.


                                                                                     Page 2 of 8

Page 3

                                                                                       2008/744



14.   Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’
      notice of intention to commence works to arrange a “pre start” meeting prior to the
      commencement of works.
15.   The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to ensure
      that any sub contractors also have the appropriate insurance and public liability
      documentation.
16.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy
      of Council’s signed approved drawings and conditions by the applicant.
17.   The Consulting Engineers for the project shall be currently Registered Professional Engineers
      of Queensland (RPEQ).         The consulting engineers are responsible for arranging all
      inspections, with Council’s Construction Technical Officer or nominated staff.
18.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
      project. (This person will be the contact for the project).
19.   Council standards shall apply to these works unless otherwise modified herein.
20.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply,
      sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
      damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify the Manager Land Development and shall forthwith rectify the damage to that
      property or facility at its cost and to the satisfaction of the Manager Land Development.
      All rectification works are to be completed prior to the commencement of the use or,
      alternatively, the Applicant may request the Council to carry out the rectification work at the
      Applicant’s cost, such cost being paid by the Applicant to the Council prior to the
      commencement of the use.
      In the case of any emergency the Council shall be entitled to rectify such damage at the cost
      of the Applicant, such cost being paid prior to the commencement of the use.
21.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
22.   Construction work and other associated activities are permitted only during the hours of 7.00
      am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
      except where extended hours are approved by the Manager-Land Development or his
      nominee.
23.   All signage, including that for safety during construction shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
24.   Safe pedestrian access on Bluefin Court shall be maintained at all times. Should footpath /
      road closures be necessary to carry out construction works, Council’s Construction Technical
      Officer (ph 0410 512 505) must be notified prior to the proposed closure.
25.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such
      fines can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways. Although the sediment and erosion control
      measures have been approved on drawing No18095-OW1 by SCG Consulting Engineers
      dated April 2008, Council’s Manager – Land Development may request further controls to be
      installed should approved measures be inefficient.
                                                                                     Page 3 of 8

Page 4

                                                                                            2008/744



26.    The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant
       traps in accordance with the manufacturers specifications.
27.    The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant
       traps on a weekly basis and after each storm event.
       The owners of the subject property shall enter into an ongoing maintenance contract with a
       Registered Contractor to clean and maintain the grease/oil arrestor pits/gross pollutant traps
       on a regular three monthly cycle and on a “On Call” basis in the case of an emergency.
       The management and maintenance of the grease/oil arrestor pits/gross pollutant traps shall be
       included in the Community Management Scheme for the completed development.
28.    Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement
       of satisfactory “As Constructed” records shall be submitted to Council.
       As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
       (RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location,
       level and type of all services and structures. All of which shall be submitted to Council for
       checking and for Council’s records.
       The data must fully detail levels for all engineering works including but not limited to drainage
       structures, finished ground levels and pavement surface levels. The data shall be submitted in
       the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
       are available at www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering
       Design Standards – Roads, Drainage and Earthworks.
       Approval of works shall not be granted until all As Constructed information has been supplied
       and accepted by Council.
29.    A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
       be imposed on construction works during the maintenance period, which is a minimum period
       of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
       Developer for the works.
30.    The works to become Council assets will not be accepted "On Maintenance" until the
       landscaping is completed.
31.    These works are also to be in compliance with the relevant conditions of Development Permit
       No. 2008/0203.
32.    Notwithstanding that Council has checked the plans with due care, where it is found during
       construction that variations from Council's standards exist, then Council standards shall apply.

5      REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency         Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.    Plan / Document Name                        Date
 0885 WD24                         Landscaping     Plan     –   Greg   Gibbs   April 2008
                                   Architects


                                                                                       Page 4 of 8

Page 5

                                                                                              2008/744



 18095-OW1                 .        Operational Works Plan (Sediment &           April 2008
                                    Erosion    Control   Plan) –  SCG
                                    Consulting Engineers
 1874-2                    B        Ground Hydraulic Services (Stormwater        2 July 2008
                                    Disposal Plan) – Construction Hydraulic
 0885 WD02                          Site Plan (Access & Footpath Detail          April 2008
                                    Plan) – Greg Gibbs Architects

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    Should any changes or modifications to the approved plans be required as a result of
      construction constraints, a Change to an Existing Approval Application under the Integrated
      Planning Act must be made. Amended plans clearly indicating the changes must be lodged
      with this application along with the appropriate fees.
2.    The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
      building site in a way that makes or causes audible noise to be made from the building work:-
      2.1.    On a Sunday or public holiday, at any time; or
      2.2.    On a Saturday or a business day, before 7.00am or after 6.30pm.
      A maximum penalty of $1,500 applies to an offence under this legislation.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

Not applicable

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable




                                                                                         Page 5 of 8

Page 6

                                                                                      2008/744



10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required         Subject of the required Development Permit
 Nil

11     SELF ASSESSABLE CODES

Not applicable

12     SUBMISSIONS
Not applicable

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not applicable
14     RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15     OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,




Denis Wallace
PLANNING OFFICER




                                                                                    Page 6 of 8

Page 7

                                                                                               2008/744



                                                 Appeal Rights
                                                INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                                               (5) If an application is processed under section
The following is an extract from the Integrated            6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4).                                  application are available only for the aspects of the
                                                           development that would have required public
Division 8 - Appeals to court relating to
                                                           notification under the repealed Act.
development applications
Appeals by applicants                                          (6) If an application involves assessment
4.1.27.(1) An applicant for a development                  against a concurrence agency code, appeal rights
application may appeal to the court against any of         for submitters for the application are not available
the following-                                             against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a              concurrence agency’s response for the code.
    development application;                               Appeals by advice agency submitters
(b) a matter stated in a development approval,             4.1.29.(1) An advice agency may, within the limits
    including any condition applying to the                of its jurisdiction, appeal to the court about the
    development, and the identification of a code          giving of a development approval for a
                         1
    under section 3.1.6;                                   development application if-
(c) the decision to give a preliminary approval            (a) the development application involves impact
    when a development permit was applied for;                 assessment; and
(d) the length of a currency period;                       (b) the advice agency told the applicant and the
(e) a deemed refusal.                                          assessment manager to treat its response to
                                                               the application as a submission for an appeal.
    (2) An appeal under subsection (1)(a) to (d)
must be started within 20 business days (the                   (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the             business days after the day the decision notice or
decision notice or negotiated decision notice is           negotiated decision notice is given to the advice
given to the applicant.                                    agency as a submitter.
    (3) An appeal under subsection (1)(e) may be           Appeals for matters arising after approval given
started at any time after the last day a decision on       (co-respondents)
the matter should have been made.                          4.1.30.(1) For a development approval given for a
Appeals by submitters                                      development application, a person to whom any of
                                                           the following notices have been given may appeal
4.1.28.(1) A submitter for a development
                                                           to the court against the decision in the notice-
application may appeal to the court about-
                                                           (a) a notice giving a decision on a request for
(a) the giving of a development approval, including
                                                               extension of the currency period for an
    any conditions (or lack of conditions) or other
                                                               approval;
    provisions of the approval; or
                                                           (b) a notice giving a decision on a request to make
(b) the length of a currency period for the approval.
                                                               a minor change to an approval.
    (2) The appeal must be started within 20
                                                               (2) The appeal must be started within 20
business days (the “submitters appeal period”)
                                                                   business days after the day the notice of the
after the day the decision notice or negotiated
                                                                   decision is given to the person.
decision notice is given to the submitter.
                                                               (3) Subsection (1)(a) does not apply if the
    (3) If a person withdraws a submission before
                                                                   approval resulted from a development
the application is decided, the person may not
                                                                   application (superseded planning scheme)
appeal the decision.
                                                                   that was assessed as if it were an
    (4) If an application involves both impact                     application under a superseded planning
assessment and code assessment, appeal rights                      scheme.
for submitters are available only for the part of the
                                                               (4) Also, a person who has made a request
application involving impact assessment.
                                                                   mentioned in subsection (1) may appeal to
                                                                   the court against a deemed refusal of the
                                                                   request.
1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                             Page 7 of 8

Page 8

                                                                                              2008/744

     (5) An appeal under subsection (4) may be          For Building Works Only
         started at any time after the last day the     Rights of appeal conferred by Section 4.2.9 of the
         decision on the matter should have been        Integrated Planning Act 1997 as follows:
         made.
                                                        Division 3 – Appeals to tribunals relating to
                                                        development applications
Division 9 - Appeals to court about other
matters                                                 Appeals by applicants
Appeals for matters arising after approval given
(no co-respondents)
                                                        4.2.9(1) An applicant for a development application
4.1.31.(1) A person to whom any of the following        may appeal to the Building and Development
notices have been given may appeal to the court         Tribunal against any of the following-
against the decision in the notice-
                                                        (a) the refusal, or the refusal in part, of a
(a) a notice giving a decision on a request to              development application;
    change or cancel a condition of a development
    approval.                                           (b) a matter stated in a development approval,
                                    2                       including any condition applying to the
(b) a notice under section 6.1.44 giving a decision         development, and the identification of a code
    to change or cancel a condition of a                    under section 3.1.6;
                                                                                  3
    development approval.
                                                        (c) the decision to give a preliminary approval when a
    (2) The appeal must be started within 20                  development permit was applied for;
        business days after the day the notice of the
                                                        (d) the length of a period mentioned in section 3.5.21
        decision is given to the person.
                                                              currency period;
    (3) Also, a person who has made a request
                                                        (e) a deemed refusal.
        mentioned in subsection (1)(a) may appeal
        to the court against a deemed refusal of the       (2) An appeal under subsection (1)(a) to (d) must
        request.                                        be started within 20 business days (the “applicant’s
                                                        appeal period”) after the day the decision notice or
    (4) An appeal under subsection (3) may be           negotiated decision notice is given to the applicant.
        started at any time after the last day the
                                                            (3) An appeal under subsection (1)(e) may be
        decision on the matter should have been         started at any time after the last day a decision on the
        made.                                           matter should have been made.
Appeals against decisions to change approval            The Registrar for the Building and Development
conditions under the repealed Act                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a         http://www.localgovernment.qld.gov.au/
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.
    (2) The appeal must be started within 20
business days after the day notice of the decision
is given to the applicant.


2
     Section 6.1.44 (Conditions may be changed or
                                                        3
    cancelled by assessment manager or concurrence           Section 3.1.6 (Preliminary approval may override
    agency in certain circumstances)                        local planning instrument)
                                                                                            Page 8 of 8

Used in these records

About this file

File size
61 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00000744.001 [As Published].pdf · 61 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.