Council archive · source document
Decision Notice - 010.2008.00000744.001 [As Published] · 142008.744
2008/744
and including annotations made on the plan.
2. All manholes, inspection pits and grates are to be raised to finished surface levels and kept
free of cover and visible at all times to ensure prompt access in an emergency.
3. The landscape construction is to be implemented in accordance with the amended landscape
plan, planting schedule and horticultural industry best practices.
4. All trees must be planted a minimum of 1 metre from all services.
5. All trees 45 litres or greater must be securely staked and tied to assist growth during
establishment period.
6. The Body Corporate of the development is responsible for the ongoing maintenance of
landscaping within the front road reserve.
7. Additional ground covers shall be provided to the understorey of the two (2) Syzygium
Paniculata within the waste bin garden beds.
8. Provide two (2) Syzygium Cascades to the understorey of each Archontophoenix
Cunninghamia as additional screening.
9. This Development Permit lapses if the development has not happened by 5 August 2010,
unless application to extend the currency is approved by Council.
Frontage Works, Access, Car Parking, Stormwater Disposal, Sediment & Erosion Controls and
Filling of the Site.
10. The development shall be carried out in accordance with the approved plans listed
below or as modified herein.
Plan / Rev. Plan / Document Name Date
Document No.
18095-OW1 . Operational Works Plan (Sediment & Erosion April 2008
Control Plan) – SCG Consulting Engineers
1874-2 B Ground Hydraulic Services (Stormwater Disposal 2 July 2008
Plan) – Construction Hydraulic
0885 WD02 Site Plan (Access & Footpath Detail Plan) – Greg April 2008
Gibbs Architects
11. Roof and surface runoff connection to Council’s kerb and channel in Bluefin Court shall be as
shown on drawing No. 1874-2B by Constuction Hydraulics dated 2 July 2008. Kerb adaptors
shall be used in the kerb.
12. A footpath 1.5 metres wide shall be constructed across the full frontage of the development.
The footpath shall have a slip resistant surface. The alignment of which shall be determined
on site with Council’s Construction Technical Officer. The expansion joints in any
bikeway/footpath shall be “sawcut” not trowel jointed.
13. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
installed into the first existing external downstream stormwater structure. These devices are to
be checked and cleaned on a regular basis and specifically after each rain event.
These devices are to remain in place during the civil works and construction phases of the
development.
The location and type of device to be installed shall be established at the “pre start” meeting
with Council’s Construction Technical Officer and shall be installed prior to the
commencement of any works.
Page 2 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000744.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 61 KB (small file)
- File type
No other editions are linked here.