Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Extension to Currency Period - Approved MCU21 0182 01 {As Published} · MCU21/0182.01

of 18

Text shows just the words. Original shows the document exactly as it was published.

                        Damage to Services and Assets
                 67.    Any damage caused to existing services and assets as a result of the development
                        works must be repaired at no cost to the asset owner at the following times:
                        a.      Where the damage would cause a hazard to pedestrian or vehicle safety,
                                immediately; or
                        b.      Where otherwise, upon completion of the works associated with the development.
                        Any repair work which proposes to alter the alignment or level of existing services and
                        assets must first be referred to the relevant service authority for approval.
                        Environment
                 68.    Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994)
                        must not be released from the site or to waters within the site, or be likely to be released
                        should rainfall occur, unless all reasonable and practicable measures are taken to
                        prevent or minimise the release and concentration of contamination.
                 69.    Erosion and sediment control measures must be installed and maintained to minimise
                        erosion on the site and to minimise the export of sediment and associated pollutants
                        from the site. The erosion and sediment control measures must be designed, installed
                        and maintained in accordance with current best practice standards
                        (*Refer to Advisory Notes).
                 70.    Limit soil exposure on the site to a distance of no more than 2m beyond the extent of
                        earthworks shown on the approved plans except where the exposed soil is effectively
                        stabilised without delay and prior to rainfall occurring.
                        Retention of Existing Trees and Vegetation
                 71.    All trees and vegetation identified for retention must be protected in accordance with AS
                        4970, Protection of trees on development sites by a qualified person*.
                        (*Refer to Advisory Notes).
                        Removal of Existing Trees and Vegetation
                 72.    All tree and vegetation removal works must be undertaken by a qualified person*.
                        *(Refer to Advisory Note)
                 73.    Vegetation removal or pruning must be undertaken in a manner that avoids damaging
                        surrounding vegetation and habitat.
                 74.    Fauna or fauna habitat relating to minor approved tree removal/clearing works must be
                        managed by a qualified person*.
                        *(Refer to Advisory Note)
                        Landscaping Works
                 75.    Landscape works must be supervised, undertaken and certified by qualified persons*.
                        All works must be completed in accordance with this Decision Notice.
                        (* Refer to Advisory Note)
                 76.    Landscape works must:
                        a.      Delineate all planting to grassed area interfaces with an edge as detailed within
                                the approved plans.
                        b.      Ensure amenity or sales signage and ancillary infrastructure is not installed within
                                the road reserve.
                        c.      Ensure permanent irrigation is not installed within the road reserve.




Document Set ID: 23016595
Version: 3, Version Date: 14/05/2024                                                                     Page 11 of 18

Used in these records

About this file

File size
212 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Extension to Currency Period - Approved MCU21 0182 01 {As Published}.pdf · 212 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.