Extension to Currency Period - Approved MCU21 0182 01 {As Published} · MCU21/0182.01
Erosion and Sediment Control
61. Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
Regulation 2019) must not be released from the site or to waters within the site, or be
likely to be released should rainfall occur, unless all reasonable and practicable
measures are taken to prevent or minimise the release and concentration of
contamination.
62. Sediment and erosion control measures must be in place prior to works commencing. If
such measures are not in place or are not satisfactory, “on the spot” fines may be issued.
Such fines can be issued if sediments from the site are found to enter or have the
potential to enter Council’s stormwater system, natural waterways, any downstream
stormwater filtration system or adversely impacting on other properties. The sediment
and erosion control design and measures have NOT been approved, it is the site's
Supervising Engineer who is responsible for ensuring that the sediment and erosion
control measures have:
a. Been duly designed by an RPEQ or CPESC and constructed in accordance with
"best practise" methods,
b. Been revised by an RPEQ or CPESC to address the issues raised by changes in
the projected construction schedule and/or methods,
c. Been revised to address predicted rainfall events, and
d. Achieve the desired environmental outcomes.
Council may request further controls to be installed should the implemented measures
be found inefficient.
63. The erosion and sediment control measures must be designed, installed and maintained
in accordance with the supervising engineer instructions and the current best practice
standards * (Refer to Advisory Note).
64. The developer must ensure non-essential exposure of soil is prevented by restricting the
extent of disturbance and minimising the duration of soil exposure to adverse weather
conditions and effectively turf, cover or stabilise any disturbed area without delay and
prior to rainfall occurring.
65. The developer must ensure sediment does not leave the site or enter onto adjoining
properties or Council’s drainage system due to surface runoff or on tyres of vehicles
and/or machinery. It is essential to implement appropriate approved erosion and
sediment control measures throughout the site during all phases of construction
including vehicle shakedown pad/grid (or similar) at the access to the construction site.
Where sediments or other contaminants are deposited on a road, they must be removed
so as not to enter Council’s drainage system or waterways.
66. Prior to the completion of the development and commencement of use, all site surfaces
must be effectively stabilised using methods which have achieved effective short-term
stabilisation and which will continue to achieve effective stabilisation in the medium to
long-term. For the purpose of this condition, an effectively stabilised surface is defined
as one that does not, or is not likely to result in visible evidence of soil loss caused by
sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination.
Document Set ID: 23016595
Version: 3, Version Date: 14/05/2024 Page 10 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Extension to Currency Period - Approved MCU21 0182 01 {As Published}.pdfRelated documentApplication case desk ↗
About this file
- File size
- 212 KB (small file)
- File type
No other editions are linked here.