Council archive · source document
Extension to Currency Period - Approved MCU21 0182 01 {As Published} · MCU21/0182.01
Plan No. Rev. Plan/Document Name Date
3 . Subdivision Plan, prepared by MAR 2021
and+design
28. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
29. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
Currency Period
30. This development approval lapses if the requirements of the conditions have not been
completed and an application for plan seal is not lodged with Council by 10 March 2028,
unless an application to extend the currency period is approved by Council.
Community Management Statement
31. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the subdivision
plan to Council for compliance assessment.
32. Prior to the submission of the subdivision plan to Council for plan sealing, all conditions
of this Development Approval, Development Approval MCU21/0182 and any associated
operational works approvals must be completed and accepted by Council.
OPERATIONAL WORKS – OPW21/0291.01
Approved Plans
33. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table.
These plans must be amended in accordance with the conditions.
Plan No. Rev. Plan/Document Name Date
31110-CS . Operational Works: Cover Sheet as October 2021
prepared by SCG Consulting Engineers
31110-OW1.1 . Operational Works: Survey & Existing October 2021
Services as prepared by SCG Consulting
Engineers
31110-OW2.1 . Operational Works: Silt & Sediment October 2021
Control as prepared by SCG Consulting
Engineers
31110-OW3.1 B Operational Works: Bulk Earthworks as 18 January
prepared by SCG Consulting Engineers 2022
31110-OW4.1 B Operational works: Driveway & Access 18 January
as prepared by SCG Consulting 2022
Engineers
Document Set ID: 23016595
Version: 3, Version Date: 14/05/2024 Page 5 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Extension to Currency Period - Approved MCU21 0182 01 {As Published}.pdfRelated documentApplication case desk ↗
About this file
- File size
- 212 KB (small file)
- File type
No other editions are linked here.