Extension to Currency Period - Approved MCU21 0182 01 {As Published} · MCU21/0182.01
31110-OW4.2 . Operational Works: Driveway Details as October 2021
prepared by SCG Consulting Engineers
31110-OW4.2 A Operational Works: Vehicle Manoeuvring 18 January
as prepared by SCG Consulting 2022
Engineers
31110-SW1.1 B Operational Works: Stormwater 18 January
Management as prepared by SCG 2022
Consulting Engineers
211207 02 a Specification as prepared by Seed DEC 2021
landscape design as amended by
Conditons
211207 03 d Landscape Plan as prepared by Seed FEB 2021
landscape design as amended by
Conditons
211207 04 d Planting Plan as prepared by Seed FEB 2021
landscape design as amended by
Conditons
211207 05 d Planting Schedule as prepared by Seed FEB 2021
landscape design as amended by
Conditons
211207 06 a Details as prepared by Seed landscape DEC 2021
design as amended by Conditons
211207 07 b Details as prepared by Seed landscape FEB 2021
design
Currency Period
34. The Currency Period for this development approval lapses if the development has not
substantially started by 10 March 2028, unless an application to extend the currency
period is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
35. All necessary approvals from external service providers (e.g. Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
36. A condition report including photographs of the frontage of the site must be completed
and submitted to council at the prestart meeting / prior to any works commencing.
37. Certificates demonstrating currency of public liability insurance and works insurance
covering the works must be submitted to Council prior to the prestart meeting.
38. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500.
The pre-start meeting must include the relevant parties for the following aspects of the
works:
Document Set ID: 23016595
Version: 3, Version Date: 14/05/2024 Page 6 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Extension to Currency Period - Approved MCU21 0182 01 {As Published}.pdfRelated documentApplication case desk ↗
About this file
- File size
- 212 KB (small file)
- File type
No other editions are linked here.