Original source · versioned page text
Meeting papers
• Both qualitative and quantitative analysis of responses was conducted.
• The analysis deep dive was extensive and reviewed over 500,000 words.
Phase 5 – Draft DMP Preparation:
• Integration of findings from evidence-based analysis and stakeholder insights.
• Development of Draft DMP incorporating principles, strategies and actions across key
areas:
• community wellbeing, environmental protection, transport, housing, and tourism
industry
• development.
Phase 6 – Phase 2 Community Consultation:
• Release of the draft DMP for public and stakeholder
• consultation.
• Multi-channel engagement, including workshops, surveys, social media campaigns,
and targeted stakeholder meetings.
• Collection and analysis of feedback to refine and finalise the plan.
• Peer Review
Phase 7 – Current Phase - Endorsement and Implementation Planning:
• Final DMP to Council for adoption.
• Development of a draft implementation framework, including monitoring and evaluation
measures to track progress and ensure accountability.
Community Feedback
This Destination Management Plan is a community-led plan, shaped through extensive local input, and
built on a shared vision for Noosa’s future.
With broad support from across all parts of Noosa we’re embracing a regenerative approach to tourism.
This plan represents a shared opportunity to future-proof the region, ensuring we can better manage a
growing visitor economy and safeguarding the Noosa experience for everyone.
Community Priorities Ranking*
100% 86%
78%
80% 69%
61%
60% 49% 53%
36% 42%
40% 29%
20%
0%
Figure 19: Phase 1 Community Engagement - Community Priorities
Page | 53
Page 99 of 122
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.