Site Rehabilitation Plan

 

Primary weeding will occur in two (2) phases as described below:

e Phase 1: Primary Weeding; and
e Phase 2: Ongoing maintenance.

The timing of each stage will:

2.3

2.3.1

2.3.2

2.3.3

2.3.4

2.4

e Phase 1: commence as soon as possible after thinning works; and
e Phase 2: continue on an “as needs” basis.

Personnel / Procedures

Suitably qualified site personnel, or an enterprise experienced in native bush
regeneration, will be engaged for all regeneration works.

The Bush Regeneration team will include suitably qualified Bush Regenerators,
including a Regeneration Site Manager, who will be responsible for all project
management and staff supervision and report directly to the Project Manager.

The Bush Regeneration team will consist of a team consisting of a sufficient
number of personnel, including the Regeneration Site Manager, for site works.

The Regeneration Site Manager will have demonstrated expertise in successful

project management, staff supervision and hold/gain all necessary licenses and
approvals.

Thinning of Dense Undergrowth

Vegetation within Open space areas comprised of monocultures of dense understorey
species will be thinned to allow for natural regeneration as follows:

Shrub species will be thinned to allow a minimum 1m separation between
canopies;

Primary weeding will then be implemented where necessary as outlined in
Section 2.6;

On-going maintenance and monitoring of natural regeneration will be
completed in accordance with Section 4;

Where natural regeneration does not occur, reinforcement plantings will be
provided and maintained as outlined in Section 3.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 7

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.