Site Rehabilitation Plan

 

2. REGENERATION STRATEGY
2.1 Introduction

Portions of the vegetation within Open space areas have experienced historical and
current anthropogenic alterations (e.g. fire, grazing, slashing and clearing). This
modification has provided a series of opportunities for weed species to invade the
subsequently fragmented communities. Following natural regeneration, foreign
species have persisted and competed with native species for limited resources (e.g.
light, nutrients and water). Also in some areas, dense growth of native shrub species
has resulted in a monoculture within the understorey and has stalled natural
regenerative processes. This acts as a limiting factor to native regeneration.
Therefore, in order to enhance the natural values of the site, thinning of dense fire-
induced vegetation as welt as weed control and weed removal techniques are required
in varying circumstances.

The objectives of the site regeneration strategy are to:

Thin dense fire-induced undergrowth;

e Remove weeds utilising “best practice” protocols;

e Conserve the current ecological values of areas containing habitat for
identified significant species; and

e Naturally regenerate vegetation.

2.2 Timing

Regeneration will commence during the development phase or as soon as possible
after development approval and when the area has been designated as suitable for
regeneration.

Thinning of dense undergrowth will commence as the initial stage of site regeneration.
An ecologist in consultation with Council shall determine the need for thinning within
Open space areas. Thinning works will occur in two (2) phases as described below:

e Phase 1: Initial thinning works; and
e Phase 2: Ongoing maintenance.

The timing of each stage will:

e Phase 1: commence as soon as possible after development approval; and
e Phase 2: continue on an “as needs” basis.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 6

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.