Council archive · source document
Application part 3 [As Published] · 142007.1242
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Appendix G — Acid Sulfate Soil Revision No: 000 Construction Stage October 2006 Environmental Procedures Commercial Development Eenie Creek Road. 2 of 4 B4. 5. Maintain a supply of not tess than 0.5 tonne (check against likely | Construction daily usage) of lime (CaCO) on site at all times. A supply of | Manager hydrated (slaked) lime shall be kept on-site for the treatment of acidic waters. Treatment rate of surface water will be in accordance with SPP’. The supplies should be stored in a covered and bunded area to prevent accidental release. 6. Site access and all records must be made available to Council or | Construction Departmental officers on official business at all times. Manager 7. All surface run-off and groundwater seepage within excavated | Construction areas to be directed to a treatment or detention basin for quality | Manager correction prior to off site discharge, or reuse on site. 8. Surface runoff from undisturbed areas of the site to be isolated | Construction from active work areas by drains or bunding and directed to an | Manager approved stormwater discharge point. 9. Lime treat exposed soils in any open excavation in accordance | Construction with Section B4 Lime Application Rate and Methodology. Manager 10.Wherever practical, earthworks handling is to involve transport | Construction directly from cut to treatment/fill area on site. Manager 11. Treatment pads on site are to be contained by bund walls, | Construction constructed with non PASS (Potential Acid Sulfate Soils) or fully | Manager lime treated soils. 12. Lime is to be added to expose excavated soils in accordance with | Construction Section B4 below. Manager 13. Subgrade soil under footings and slabs to be lime treated at a | Construction rate of 5 kg/m’. Manager 14. Subgrade soil to be lime treated at a rate of 5 kg/m? for each 1m | Construction height of soil under the base of any stockpile before placement. Manager 15. If groundwater pH change exceeds the performance criteria (refer | Construction Appendix A), then treat excavation batters with a surface | Manager application of lime at 5kg/m’, 16, Monthly water monitoring reports are to be maintained on site for | Construction review by CCC or EPA, at their request Manager LIME APPLICATION RATES AND METHODOLOGY The foliowing procedure applies to the treatment of excavated soils either to be exported from the site, or backfilled into the excavation. A number of key assumptions were considered in calculating liming rates from test results, viz: e Material dry bulk density of 1.8 t/m3; e Use of a minimum safety factor of 1.5; ¢ The neutralising value of the selected liming product 2 90%. Within 18 hours, all excavated soils are to be treated at a rate of 9 kg lime/m?. Lime treatment is to be undertaken in accordance with the attached flow diagram, Figure 1. 1 Planning & Managing Development Involving Acid Sulfate Soils, State Planning Policy 2/02. Golder Associates 06683025-3000(AA)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.