Skip to the record
Search everything, all in one place.

Council archive · source document

Application part 3 [As Published] · 142007.1242

of 137

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

 

Appendix G — Acid Sulfate Soil
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

 

 

Revision No: 000

October 2006

1of4

 

B1. ENVIRONMENTAL VALUES

To avoid potential adverse effects on the natural and
(including infrastructure) and human health.

B2. OBJECTIVES

1.

built environment

Satisfy the requirements of the Guidelines for Sampling and Analysis of

Lowland Acid Sulfate Soils in Queenstand 1998.

Comply with the State Planning Policy 2/02, Planning and Managing

Development Involving Acid Sulfate Soils.

Comply with the Environmental Protection (Water) Policy

1997.

Comply with the instructions for the Treatment and Management of Acid

Sulfate Soils, 2001.

B3. ENVIRONMENTAL CONTROL MEASURES

The following provides a list of the environmental control measures for the
management for potential acid sulfate soils at the site.

 

Environmental Control Measure

Responsibility

 

1.

The Construction Manager is to appoint an Environmental
Representative to supervise and report on environmental
management of the development works.

Construction
Manager

 

Training to be provided to all site staff and contractors engaged in
earthworks or drainage activities on the site. An emphasis should
be placed on the field recognition of PASS on the site. The scope
of training should also include:

An outline of the sensitivity of the area to environmental harm

¢ The potential for acid generation on the site and its potential
impacts

e Details of the management strategies in place for PASS

« Responsibilities of individuals in the implementation of the
management strategies

« Descriptions of PASS and how to identify them on site

* Steps to be taken if PASS are encountered

© Details of reporting and monitoring responsibilities

Construction
Manager

 

. Accurate and up to date records must be maintained for all

monitoring. Records will consist of:

¢ Testing and treatment undertaken in the management of acid
sulfate soils on the site.

volumes of excavated soil

pH testing results

liming dosage rates

location of placement of fill on or off-site

surface water testing results (if required)

groundwater testing results

Construction
Manager

 

 

. All complaints, sightings of indicators of acid sulfate damage or

other environmental incidents, to be recorded together with any
resulting investigation or response and reported to CCC.

Construction
Manager

 

 

 

Golder Associates

06683025-3000(AA)

 

 

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.