Council archive · source document
Application part 3 [As Published] · 142007.1242
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Appendix G — Acid Sulfate Soil Construction Stage Environmental Procedures Commercial Development Eenie Creek Road. Revision No: 000 October 2006 1of4 B1. ENVIRONMENTAL VALUES To avoid potential adverse effects on the natural and (including infrastructure) and human health. B2. OBJECTIVES 1. built environment Satisfy the requirements of the Guidelines for Sampling and Analysis of Lowland Acid Sulfate Soils in Queenstand 1998. Comply with the State Planning Policy 2/02, Planning and Managing Development Involving Acid Sulfate Soils. Comply with the Environmental Protection (Water) Policy 1997. Comply with the instructions for the Treatment and Management of Acid Sulfate Soils, 2001. B3. ENVIRONMENTAL CONTROL MEASURES The following provides a list of the environmental control measures for the management for potential acid sulfate soils at the site. Environmental Control Measure Responsibility 1. The Construction Manager is to appoint an Environmental Representative to supervise and report on environmental management of the development works. Construction Manager Training to be provided to all site staff and contractors engaged in earthworks or drainage activities on the site. An emphasis should be placed on the field recognition of PASS on the site. The scope of training should also include: An outline of the sensitivity of the area to environmental harm ¢ The potential for acid generation on the site and its potential impacts e Details of the management strategies in place for PASS « Responsibilities of individuals in the implementation of the management strategies « Descriptions of PASS and how to identify them on site * Steps to be taken if PASS are encountered © Details of reporting and monitoring responsibilities Construction Manager . Accurate and up to date records must be maintained for all monitoring. Records will consist of: ¢ Testing and treatment undertaken in the management of acid sulfate soils on the site. volumes of excavated soil pH testing results liming dosage rates location of placement of fill on or off-site surface water testing results (if required) groundwater testing results Construction Manager . All complaints, sightings of indicators of acid sulfate damage or other environmental incidents, to be recorded together with any resulting investigation or response and reported to CCC. Construction Manager Golder Associates 06683025-3000(AA)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.