Council archive · source document
Application part 3 [As Published] · 142007.1242
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Site Rehabilitation Plan « Works undertaken; ' Progress of regeneration/revegetation areas. in accordance with Performance Targets; e Significant problems encountered (death of seedlings, vandalism etc.) and the effect of these on the plantings and aims of the revegetation strategy; e Success or failures of measures implemented to rectify previously identified problems; and . ® Measures to be taken to rectify new problems. 4.4 Completion of Reporting Three (3) years after the initial planting, site management will determine if the stated objectives and performance targets of the Site Revegetation Strategy have been achieved (or close to being achieved). If not, a report will be prepared by site management identifying the works and the time frames required to ensure that the vegetation in the buffer zone has been successfully established. Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.