Skip to the record
For the highest quality transcripts.

Council archive · source document

Application part 3 [As Published] · 142007.1242

of 137

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

Site Rehabilitation Plan

 

« Works undertaken; '
Progress of regeneration/revegetation areas. in accordance with Performance
Targets;

e Significant problems encountered (death of seedlings, vandalism etc.) and the
effect of these on the plantings and aims of the revegetation strategy;

e Success or failures of measures implemented to rectify previously identified
problems; and .

® Measures to be taken to rectify new problems.

4.4 Completion of Reporting

Three (3) years after the initial planting, site management will determine if the stated
objectives and performance targets of the Site Revegetation Strategy have been
achieved (or close to being achieved). If not, a report will be prepared by site
management identifying the works and the time frames required to ensure that the
vegetation in the buffer zone has been successfully established.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 18

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.