G2 Site Rehabilitation Plan 5. TIMING AND RESPONSIBILITIES TABLE 2 PROPOSED REVEGETATION SCHEDULE All capital works associated with this Regeneration and Revegetation Plan would be completed over a one (1) year period following the development approval under the recommended schedule below (TABLE 2). i Description Timing Expected Duration | Responsibility Thinning of | commence as soon as| 1 week - 1 month Contractor understorey possible after development i (where approval as the initial stage @ required) of regeneration/revegetation works. i Weed Control Once the site preparation of | 1-2 months Contractor each section is complete Planting and Plants are sourced and the | 1 week - 1 month Contractor Fertilising planting plan is complete i Mulching and | Progress immediately after | 1-3 months (in | Contractor Watering planting to maximise the | conjunction with chance of seedling survival weeding) i Reporting and | Weekly for the first month and then three monthly | Contractor Monitoring thereafter for one year i Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.