Council archive · source document
Application part 3 [As Published] · 142007.1242
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Site Rehabilitation Plan 6. SUMMARY This plan contains a detailed set of directions and measurable performance criteria to guide the rehabilitation program of the Open space areas within the development site. The plan aims to improve the overall conservation and landscape values of the open space areas and to restore the natural ecological processes and facilitate ecological sustainability. Through implementation of the strategies to achieve the set objectives contained within this plan, all disturbed areas of vegetation will be revegetated or subject to regeneration works. This will provide improved and extended habitat for a variety of flora and fauna found within the locality and will inhibit the impacts of the development upon retained vegetation including invasion by weed and pest species, and will also control human access and reduce edge effects. Each of the Performance Objectives contains measures designed to allow the applicant to demonstrate that effective revegetation requirements are being achieved and for Council to sign off on the success of the implementation program. Ongoing monitoring of existing and planted vegetation will be carried out over a three (3) year period to assess the health and vigour of this vegetation and to identify and control any weed species that have resprouted or dispersed to the site over a three year period. Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.