Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page 5
Eenie Creek Road, Noosaville

 

 

 

 

 

5.0 ENVIRONMENTAL MANAGEMENT ORGANISATION CHART

This section outlines the framework that will be used by the Project Manager to manage,
document, and report on environmental issues for the development.

 

Project Manager

 

 

Site Manager

 

 

 

CONTRACTORS
Eg. Civil
Landscapers
Utilities
Builders

 

 

 

The Project Manager is ultimately responsible for Environmental Management during the
construction phase of the development.

The Project Manager will identify which actions are to be delegated to those responsible for
managing environmental issues.

6.0 CONTRACTOR MANAGEMENT

Contractors and their staff are required to comply with the provisions of the EMP at all times.
An understanding of environmental responsibility will be documented by each contractor, or
the nominated site representative, for each organisation on the Site Induction Signatory Form
(Refer Section 11.1). Contractor’s environmental performance obligations shall be
incorporated into the contractor’s conditions of work for the proposed development.

7.0 MONITORING AND INSPECTION

Environmental inspections will be carried out by means of a weekly meeting of responsible
personnel and a site walk through. This will be used to identify any areas of non-
conformance or opportunities for improvement. Any non-conformances will be reviewed at
the weekly meeting.

Monitoring is to be documented as outlined in Section 11.2 and monitoring programs will be
modified based on the findings of site inspections and/or results of testing.

Golder Associates

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.