Council archive · source document
Application part 3 [As Published] · 142007.1242
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
n Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page 6 Eenie Creek Road, Noosaville 8.0 NON CONFORMANCE Any non-conformance to the EMP must be addressed as soon as is practicable. The personnel responsible for the non-conformance must be notified immediately for purposes of issuing rectification instructions. Non-conformances are formally documented through an audit report (Refer Section 11.3). 9.0 AUDITING OF THE EMP 9.1 Responsibilities The construction activities at the development will be audited for compliance with the EMP and its procedures by the environmental auditor. The environmental auditor will be appointed by the Project Manager. It is the environmental auditor’s responsibility to: 1. Provide an independent assessment of compliance with the Environmental Procedures in Appendices A to F. 2. Report on observed activities that have, or may cause, an impact to the environment or non-conformance to regulation. 3. | Provide recommendations to the Project Manager regarding practical initiatives that can be employed to improve the effectiveness of environmental management at the development site. 4. Provide a copy of the Environmental Audit Report to the project manager. 9.2 Frequency The frequency of Environmental Audits from commencement of site construction activities will be as follows: ¢ Every fortnight until the construction phase is completed. 10.0 COMMUNITY RELATIONS Where concerns are made by the community or third parties to the Project Manager, or any contractors under its control, these will be forwarded to the project manager immediately. The process for dealing with concems is documented in Section 11.4. Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.