Council archive · source document
Application part 3 [As Published] · 142007.1242
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Appendix A — General Site Management Construction Stage Environmental Procedures Commercial Development Eenie Creek Road. Revision No: 000 October 2006 1 of 2. Al, A2. A3. ENVIRONMENTAL VALUES The overall protection of the surrounding environmental life, health and wellbeing of humans. OBJECTIVES To meet the requirements of the Environmental Protection Act 1994, all Queensland Environmental Protection Policies. Minimise impact on the environment, specifically on the amenity of The surrounding premises, from activities during construction. ENVIRONMENTAL CONTROL MEASURES The following provides a list of the environmental control general management of the site. measures for the Environmental Control Measure Responsibility 1. Ensure that all staff and contractors are aware of the potential environmental impacts and required minimum environmental control measures and their responsibilities before they commence any site works. Project Manager . Any dangerous areas of the site to be adequately sign posted indicating the danger. Project Manager Occupants of adjoining premises will be notified prior to the commencement of works of the nature and estimated duration of construction activity and environmental management controls to be implemented to limit potential nuisances. Project Manager Temporary security lighting of the site must be designed and located to ensure that there is no direct light spill that alters the amenity of the adjacent properties. Project Manager . General hours of work will be between 7.00 am to 6.00 pm Monday to Saturday, excluding public holidays, or as agreed with the Council. If approved by Council, work outside of the specified hours (7am to 6pm) may be carried out if suitable measures are undertaken to suppress noise and air emissions/dust from the site. Written warning must be provided to the neighbouring residents if the activity with the potential to emit excessive noise is to be undertaken outside the general hours. Project Manager All complaints received must be recorded in writing including investigations undertaken, conclusions formed and actions taken. This information must be made available to the administrating authority on request. Project Manager Maintain a high standard of housekeeping and ensure that materials that are likely to attract vermin are properly disposed of. Project Manager Dispose of any waste illegally dumped at the site. Project Manager Provide bins for contractors and staff at locations where they consume food. Ensure bins are emptied regularly. Project Manager 10.Sweep roads abutting the site at regular frequencies during construction periods or whenever inspections show signs of soil on access roads or the site entrance. Project Manager 11. Install and maintain a grate at the site entrance to reduce unwanted soil from leaving site via vehicle tyres. Project Manager Golder Associates 06683025 - 3000(AA)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.