Appendix A — General Site Management
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

 

 

Revision No: 000
October 2006

2 of 2

 

A4.

AS.

 

Environmental Control Measure

Responsibility

 

12. All stockpiles to be watered or covered with tarpaulins to
minimise dust emissions and not stored where soil could enter
the stormwater system.

Project Manager

 

13. All site personnel to report all non-conformances to the Project
Manager within 1 hour of occurrence or observance.

Project Manager

 

 

14. All dangerous goods (eg distillate and petroleum) to be stored
in a bunded area.
A distance of not Jess than 3 m from the storage site will be
clear of combustible vegetation and refuse.
No more than 2 500 L for class PG | or class PG Il liquids are
to be stored on site during operation. No more than 5 000 L of
PG Ill or 10 000 L of Combustible liquids (such as diesel) are
to be stored on site during operation.

 

Project Manager

 

INSPECTION AND MONITORING

The following inspection and monitoring program will be conducted at the site.
The results of these activities will be recorded on the inspection/monitoring
data sheets provided with the EMP.

 

 

 

 

 

 

 

 

 

 

 

Activity Frequency Responsibility

1. Inspect signage at dangerous areas of | Weekly Project Manager
the site.

2. Inspect security lighting. Weekly Project Manager

3. Inspect content and quantity of material | Weekly Project Manager
in bins.

4, Inspect site for general tidiness and Weekly Project Manager
illegal dumping of wastes.

5. Inspect roads abutting the site for soil, Weekly Project Manager
sand, clay or stones originating from the
construction activities on site.

6. Check all stockpiles are covered or | Daily Project Manager
maintained moist when not in use.

7. Check for correct storage of all Weekly Project Manager
dangerous good on site.

 

PERFORMANCE INDICATORS

 

 

 

Item Performance Indicator
1. Signage No incidences due to absence or adequacy of signage.
2. Lighting No community complaints regarding security lighting.

 

3. Hours of work

No work conducted outside normal hours without evidence of
measures taken to suppress noise and air emissions/dust.

 

 

4, Site Site remains tidy. No complaints from local community or
Housekeeping relevant regulatory authorities.
5. Site No occurrence of illegal dumping of waste at site or in general

Housekeeping site waste bins.

 

6. Public Roads

No adjacent public roads contain soil, sand, clay or stones
originating from the construction activities on site.

 

7. Dangerous Goods

No sign of seepage or spills of dangerous goods stored on site.

 

 

8. Non
conformances

 

All non conformances are reported and rectified.

 

 

Golder Associates

06683025 - 3000(AA)

 

 

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.