Council archive · source document
Application part 3 [As Published] · 142007.1242
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Appendix A — General Site Management Construction Stage Environmental Procedures Commercial Development Eenie Creek Road. Revision No: 000 October 2006 2 of 2 A4. AS. Environmental Control Measure Responsibility 12. All stockpiles to be watered or covered with tarpaulins to minimise dust emissions and not stored where soil could enter the stormwater system. Project Manager 13. All site personnel to report all non-conformances to the Project Manager within 1 hour of occurrence or observance. Project Manager 14. All dangerous goods (eg distillate and petroleum) to be stored in a bunded area. A distance of not Jess than 3 m from the storage site will be clear of combustible vegetation and refuse. No more than 2 500 L for class PG | or class PG Il liquids are to be stored on site during operation. No more than 5 000 L of PG Ill or 10 000 L of Combustible liquids (such as diesel) are to be stored on site during operation. Project Manager INSPECTION AND MONITORING The following inspection and monitoring program will be conducted at the site. The results of these activities will be recorded on the inspection/monitoring data sheets provided with the EMP. Activity Frequency Responsibility 1. Inspect signage at dangerous areas of | Weekly Project Manager the site. 2. Inspect security lighting. Weekly Project Manager 3. Inspect content and quantity of material | Weekly Project Manager in bins. 4, Inspect site for general tidiness and Weekly Project Manager illegal dumping of wastes. 5. Inspect roads abutting the site for soil, Weekly Project Manager sand, clay or stones originating from the construction activities on site. 6. Check all stockpiles are covered or | Daily Project Manager maintained moist when not in use. 7. Check for correct storage of all Weekly Project Manager dangerous good on site. PERFORMANCE INDICATORS Item Performance Indicator 1. Signage No incidences due to absence or adequacy of signage. 2. Lighting No community complaints regarding security lighting. 3. Hours of work No work conducted outside normal hours without evidence of measures taken to suppress noise and air emissions/dust. 4, Site Site remains tidy. No complaints from local community or Housekeeping relevant regulatory authorities. 5. Site No occurrence of illegal dumping of waste at site or in general Housekeeping site waste bins. 6. Public Roads No adjacent public roads contain soil, sand, clay or stones originating from the construction activities on site. 7. Dangerous Goods No sign of seepage or spills of dangerous goods stored on site. 8. Non conformances All non conformances are reported and rectified. Golder Associates 06683025 - 3000(AA)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.