Appendix B — Water Quality
Construction Stage
Environmental Procedures
Commercial Development

 

Revision No: 000

October 2006

1of2

 

 

 

 

 

 

 

 

 

 

Eenie Creek Road.
B1. ENVIRONMENTAL VALUES
The protection of surrounding surface water and groundwater.
B2. OBJECTIVES
1. Limit environmental impact on adjacent residential and commercial premises.
2. Control potential sources of contaminated stormwater.
3. Limit the quantity of soil lost during construction activities.
4. Manage all discharges of water from the construction site.
5. Comply with the Environmental Protection (Water) Policy 1997, and NSC
local laws, codes and policies.
6. Use the Australian and New Zealand Guidelines for Fresh and Marine Water
Quality 2000 for the protection of environmental values.
7. Undertake Erosion and Sediment Control in accordance with the Institution
of Engineers (Qld) Erosion and Sediment Control Guidelines (1996).
B3. ENVIRONMENTAL CONTROL MEASURES
The following provides a list of the environmental control measures for
management of surface and ground waters at the site.
Environmental Control Measure Responsibility
1. All stormwater will be managed in accordance with the | Construction Manager
stormwater treatment plan (Appendix H).
2. The velocity of stormwater over the site will be teduced | Construction Manager
where gradients exist by the installation of retarding
structures, such as silt fences.
3. Stockpiles when not in use will be watered to minimise Construction Manager
dust emissions and not placed on footpaths, or
stormwater drains.
B4. INSPECTION AND MONITORING

The following inspection and monitoring program will be conducted at the site.

 

Activity

Frequency

Responsibility

 

1. Inspect disturbed areas for signs of land
erosion or deterioration.

«Weekly
* After each major
rainfall event*.

Construction
Manager

 

2. Inspect location, design and stormwater
protection of stockpiles so that
sediment is not deposited into the
stormwater system.

 

 

«Weekly
e After each major
rainfall event.

 

Construction
Manager

 

* > 25mm within a 24 hour period.

 

Golder Associates

06683025- 3000(AA)

 

 

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.