Appendix D — Air Quality Management | Fevision No: 000 Construction Stage October 2006 Environmental Procedures Commercial Development Eenie Creek Road. 1of2 D1. D2. D3. ENVIRONMENTAL VALUES The protection of air quality for the environment and life, health and well being of humans. OBJECTIVES 14. Minimise the health risk or reduction in air quality due to air emissions and dust to site workers, and nearby residences premises. 2. Minimise the creation of airborne dust and excessive vehicle exhaust emissions. 3. Minimise the quantity of soil lost during construction activities. 4. Comply with the Environmental Protection (Air) Policy 1997. ENVIRONMENTAL CONTROL MEASURES The following provides a list of the environmental contro! measures for air quality management at the site. Environmental Control Measure Responsibility 1. Exposed areas including stockpiles and unsealed internal Project Manager roads will be sprayed with water on a regular basis. Care will be taken not to over apply water. 2. Install dust screens during earth moving operations where | Project Manager water spraying is not practical. 3. Loads of material on trucks will be covered with tarpaulins or | Project Manager sliding covers prior to leaving the site. 4. Work schedules will be arranged so that the area of disturbed | Project Manager land is kept to a minimum. 5. Restrict. concrete dust emissions through the use of | Project Manager preventative measures such as water sprays. 6. Site vehicles will be maintained in an operable condition in | Project Manager accordance with manufacturer's specifications. 7. Exhaust emission effects will be minimised by ensuring that | Project Manager site vehicles and machinery are fitted with appropriate emission control equipment that is maintained and serviced to manufacturer's specifications. 8. Earth bunds to be covered or maintained moist (eg. tarpaulin | Project Manager or turf etc) when not in use. Golder Associates 06683025 - 3000(AA)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.