Appendix D — Air Quality Management | Fevision No: 000
Construction Stage October 2006
Environmental Procedures
Commercial Development
Eenie Creek Road.

1of2

 

 

 

 

D1.

D2.

D3.

ENVIRONMENTAL VALUES

The protection of air quality for the environment and life, health and well being
of humans.

OBJECTIVES

14. Minimise the health risk or reduction in air quality due to air emissions and
dust to site workers, and nearby residences premises.

2. Minimise the creation of airborne dust and excessive vehicle exhaust
emissions.

3. Minimise the quantity of soil lost during construction activities.

4. Comply with the Environmental Protection (Air) Policy 1997.

ENVIRONMENTAL CONTROL MEASURES

The following provides a list of the environmental contro! measures for air
quality management at the site.

 

Environmental Control Measure Responsibility

 

1. Exposed areas including stockpiles and unsealed internal Project Manager
roads will be sprayed with water on a regular basis. Care will
be taken not to over apply water.

2. Install dust screens during earth moving operations where | Project Manager
water spraying is not practical.

3. Loads of material on trucks will be covered with tarpaulins or | Project Manager
sliding covers prior to leaving the site.

4. Work schedules will be arranged so that the area of disturbed | Project Manager
land is kept to a minimum.

5. Restrict. concrete dust emissions through the use of | Project Manager
preventative measures such as water sprays.

6. Site vehicles will be maintained in an operable condition in | Project Manager
accordance with manufacturer's specifications.

7. Exhaust emission effects will be minimised by ensuring that | Project Manager
site vehicles and machinery are fitted with appropriate
emission control equipment that is maintained and serviced
to manufacturer's specifications.

8. Earth bunds to be covered or maintained moist (eg. tarpaulin | Project Manager
or turf etc) when not in use.

 

 

 

 

 

 

 

 

 

 

 

Golder Associates 06683025 - 3000(AA)

 

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.