Appendix F — Waste Management
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.
Revision No: 000
October 2006
1of3
F1. ENVIRONMENTAL VALUE
The protection of life, health and wellbeing of people and the density of
ecological processes and associated ecosystem.
F2. OBJECTIVES
1. Ensure that the waste material on site is handled and disposed of in an
appropriate way.
2. Minimise any environmental impact on the quality of soil or groundwater.
3. Minimize waste discharge to the environment.
4. Comply with Environmental Protection (Waste) Policy 2000.
F3. ENVIRONMENTAL CONTROL MEASURES
The following provides a list of the environmental control measures for
management of waste at the site.
Environmental Control Measure
Responsibility
1. Implement good house-keeping measures, including:
staff training;
appropriate facilities to ensure satisfactory removal of
waste substances;
layout of work site; the designation of areas for certain
types of high risk activities;
collection of wind blown litter;
immediate clean-up of spills;
sediment traps will be installed at stormwater discharge
points;
maintain sediment traps ; and
remove waste so as not to produce a fire hazard.
Project Manager
2. Concrete wastes must be managed in the following manner:
mixing is to be conducted in designated areas to prevent
washings entering stormwater drainage systems;
excess wet concrete mix must be kept in designated areas
of the site so that runoff is prevented from entering
stormwater drains; and
washing of equipment and vehicles to be done in
designated areas of the site so that runoff is prevented
from entering stormwater drains.
Project Manager
3. Acrylic painting wastes must be managed in the following
manner:
equipment must be cleaned in designated areas of the site
so that washings are prevented from entering stormwater
drainage systems;
aqueous paint washings must be directed to a sump to
allow paint residues to settle out;
paint sludge must not be disposed of onto bare ground;
following sedimentation, supernatant {wash water) will be
directed to sewer under the conditions of a trade waste
permit from Council; and
paint containers must be placed into bins.
Project Manager
4. Solvent or oil based paint wastes must be disposed of into
dedicated bins as Regulated Waste’.
Project Manager
' Regulated Waste ~ as defined by the Environmental Protection Policy 2000.
Golder Associates 06683025-3000(AA)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.