Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2017-03-13 GC - Attachment 1 to Item 5 - Draft Transport Strategy 2017-2027

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Noosa Heads                   Transport & Movement   End of trip facilities   Greater parking options for bikes and scooters.


                                                                              Signage needs to slow drivers down coming into Kin Kin. More signage in general for tourists including DR Pages Rd . Include tourist areas
Hinterland & Rural Villages   Transport & Movement   Engineering works
                                                                              like Dogwood trees, Salmon lookout, Mothar Mountain rock pools


Hinterland & Rural Villages   Transport & Movement   Engineering works        Lights needed on corner of Reserve St and Pioneer Rd



Hinterland & Rural Villages   Transport & Movement   Engineering works        This road needs lot of work including along the side of roads with weeds etc.



Hinterland & Rural Villages   Transport & Movement   Engineering works        improve road signage at roundabouts and not enough details


                                                                              Exhaust problems on Noosa North Shore + many cars passing through. Is not the Biosphere. 1/3 roads are good, 1/3 ok and 1/3 dangerous.
Noosa North Shore             Transport & Movement   Engineering works
                                                                              More frequent work needed. Some residents health affected by dust


Noosa Heads                   Transport & Movement   Engineering works        Build a bridge from Noosa Parade to Woods End of Hasting Street to avoid Hastings Street altogether.



Hinterland & Rural Villages   Transport & Movement   Engineering works        View corridors along certain roads.


                                                                              Teewah Rd - BP road usage increased over years and tourism to Apollonian. More sealing of roads needed due to high traffic count.
Hinterland & Rural Villages   Transport & Movement   Engineering works
                                                                              Including signage to try and slow people down on gravel road


Noosa Heads                   Transport & Movement   Engineering works        Make Noosa woods car parking all along the length of the roads and Bridge running to Noosa Woods from Noosa parade


                                                                              Sunshine Beach Road - too car dominant through this area. Needs to be a social hub and divert cars. Make pedestrian friendly. Buses going
Coastal Communities           Transport & Movement   Engineering works
                                                                              too fast and big buses don't belong in residential streets. Slow Traffic down


                                                                              Current tenants of these areas would like to see Arcadia way as a pedestrian mall and remove cars with a direct link from Lanyana Way to
Noosa Heads                   Transport & Movement   Engineering works
                                                                              Noosa Drive.


Cooroy Township               Transport & Movement   Engineering works        Serious gridlock at the intersection entering Cooroy from the south .



Noosaville                    Transport & Movement   Engineering works        Beckmans Road needs to be improved due to traffic jams



Cooroy Township               Transport & Movement   Engineering works        The intersection at Cooroy - need to know what is happening and how it will affect properties around the area.
Log in to download the original file

2017-03-13 GC - Attachment 1 to Item 5 - Draft Transport Strategy 2017-2027(PDF, 13MB).pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.