Cooroy Township Transport & Movement Engineering works Cooroy Bypass with commercial prospects around bowls club, CSR and parking at railway station
Cooroy Township Transport & Movement Engineering works Cooroy railway bridge needs to upgraded
Hinterland & Rural Villages Transport & Movement Engineering works Speed limits on roads i.e. McKinnon Drive need to be reduced to save wildlife and for safety.
Hinterland & Rural Villages Transport & Movement Engineering works Improve maintenance of roads in the hinterland area with better drainage and edges (not just poisoning)
the prime short term concern for Cooroy is the east west access of the town for both pedestrians and traffic and future of Johnson’s Park
Cooroy Township Transport & Movement Engineering works
along the eastern side of the railway line should be considered for improvement as a practical community amenity.
Noosa North Shore Transport & Movement Engineering works Bridge from Tewantin to the North Shore opening up residential area and commercial opportunities
Suggest including the concept of "gateway/entry" point would provide and excellent opportunity to strengthen the sense of entry into
Shire Wide Transport & Movement Engineering works
Noosa Region.
Linking Noosa Parade and Noosa Drive by upgrading Weyba Rd would create a large panoramic boulevard that would display Noosa to it's
Noosa Heads Transport & Movement Engineering works
best. This linkage the visual benefits it would confer on this tourism orientated town.
Consideration of dual lane motorway, ban non-commercial vehicles form Hastings Street during peak holiday times and issue stickers for
Shire Wide Transport & Movement Engineering works residents who need to access their homes. Shuttle buses should go to the river mouth. Temporarily make Bryan St and Belmore Tce at
Sunshine Beach one way during peak school holidays times to allow parking on both sides of the street.
"Thousands and thousands of Tourists descend upon the Noosa North Shore wanting to stay but are offered nothing but a 6 car ferry to
cross the river and then only sub-standard, third world camping facilities. A bridge may not have been warranted 20 years ago but it is
now. A bridge is vital if the Council want to maintain the cash flow in the local economy by retaining those thousands of tourists to the
Noosa North Shore Transport & Movement Engineering works
north shore. Otherwise they will (are giving ) give up & stop at the lower sunshine coast.
Further a bridge will allow access to large parking facilities for all visitors to Noosa."
Noosa North Shore Transport & Movement Engineering works A bridge spanning Tewantin and the North Shore should be a top priority.
Noosa Heads Transport & Movement Pathways (offroad) Bike path from Nancy Cato park to Hastings Street to avoid traffic and tackling park cars.
Cycling can be accommodated with better urban bikeways with tunnels/bridges/overpasses. The off road cycle paths should be extended
Shire Wide Transport & Movement Pathways (offroad)
from Cooroibah to Boreen Point.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.