INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

45 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water?

No

oO Yes - (Complete Part K,) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is
not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, tem 3fb)

iP Regui chedule 2, tabs mg

IP Reguk hedule 1, part 3. table 4. Rem 3

Wild Rivers code (Note: the code does not currently contain applicable provisions jor faking or interfering with artesian wated

   
 

      
  

46 ts any of the proposed operational work to allow, under the Water Act 2000, for taking overland flow water?

[x] No

[1] Yes - Answer (a) and (b) below

IPA, schedule 8, part 1, table 4. tem Z(t}

iP Regulation, sehedule 2, table 2, item &

JP Regulation, schedule 1, part 3, lable 4, tem 3
Water Ae t 2000. section 966A {wild river area)
Wild Rivers Act 2008, section 43A

 
 

47 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?

 

IPA, schedule 8, part 1, table 4. itam 3(ch(it

IP Regulation, schedule 2. table 2, item &

IP Regulation, schedule 1, part 3, table 4, tem 3

Water Act 2000, section 9G6A (wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: the code does ner currently contain applicable provisions for sub artesian walter)

 

 

48 Is any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water?

[X] No

O Yes - Answer both (a) and (b} below

IPA, schedule & part 1, table 4, tenis 3{c)()) and 3(d)
JP Regulation, schedule 2. lable 2, iten 9

JP Requiation, schedule 1, part 3, table 4, item 3A
Water Act 2000, section 9668 (witd siver area)

49 Is the proposed operational work for the following?
For the construction of a referable dam as defined under the Water Act 2000 = [x] No OC Yes
To increase the storage capacity of a referable dam by more than 10% (%] No O Yes

if yes to either or both - (Complete Part K,) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, tem 4
IP Regutation, schedule 2, tabla 2. tem 10

 

[TIDAL WORK; WILD RIVER AREA gg

4.10 ls any of the proposed operational work tidal work, other than excluded work defined under the IPA?

(x] No

(1) Yes - Answer (a) and (b) below

IPA, schedule 8, part |, table 4, tam §
fk schedule 2, table 2. items 12, u ang v

 

 

 

 

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Op Works - Bulk Earthworks [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.