07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
45 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water?
No
oO Yes - (Complete Part K,) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is
not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, tem 3fb)
iP Regui chedule 2, tabs mg
IP Reguk hedule 1, part 3. table 4. Rem 3
Wild Rivers code (Note: the code does not currently contain applicable provisions jor faking or interfering with artesian wated
46 ts any of the proposed operational work to allow, under the Water Act 2000, for taking overland flow water?
[x] No
[1] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4. tem Z(t}
iP Regulation, sehedule 2, table 2, item &
JP Regulation, schedule 1, part 3, lable 4, tem 3
Water Ae t 2000. section 966A {wild river area)
Wild Rivers Act 2008, section 43A
47 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?
IPA, schedule 8, part 1, table 4. itam 3(ch(it
IP Regulation, schedule 2. table 2, item &
IP Regulation, schedule 1, part 3, table 4, tem 3
Water Act 2000, section 9G6A (wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: the code does ner currently contain applicable provisions for sub artesian walter)
48 Is any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water?
[X] No
O Yes - Answer both (a) and (b} below
IPA, schedule & part 1, table 4, tenis 3{c)()) and 3(d)
JP Regulation, schedule 2. lable 2, iten 9
JP Requiation, schedule 1, part 3, table 4, item 3A
Water Act 2000, section 9668 (witd siver area)
49 Is the proposed operational work for the following?
For the construction of a referable dam as defined under the Water Act 2000 = [x] No OC Yes
To increase the storage capacity of a referable dam by more than 10% (%] No O Yes
if yes to either or both - (Complete Part K,) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, tem 4
IP Regutation, schedule 2, tabla 2. tem 10
[TIDAL WORK; WILD RIVER AREA gg
4.10 ls any of the proposed operational work tidal work, other than excluded work defined under the IPA?
(x] No
(1) Yes - Answer (a) and (b) below
IPA, schedule 8, part |, table 4, tam §
fk schedule 2, table 2. items 12, u ang v
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.