Council archive · source document
07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
IRAILWAY SAFETY AND EFFICENCY yy é ; a vat
4.1.6 |s any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No
(1) Yes - This application must be referred to QueenstandTransport (QT) as Concurrence Agency.
iP Regulation, schedule 2, table 3, item 15
IKOALA ‘CONSERVATION: steaie:
4.1.7 Is any part of the premises in a koala conservation area or koala sustainability area?
No
CI Yes
IP Regulation, schedule 2, table 3, tom 19
WILD RIVER AREA’. - Although legislation provides for assessment of f operational works for residenti
(development fot the Purposes of of fthe Wild Rivers Act 2005, , cuiTently no 6 declarations for any of the wild
Lode to that type of development. * a a: Ran: Sh
4.2 Is any of the proposed operational work associated with reconfiguring a lot, if the reconfiguration is also assessable?
[X}] No
() Yes
IPA, schodule 8, part 1, table 4, item 2
IP Regulation, schedule 1, part 2, table §, item ¥(c)
Wild Rivers cade (Note: the code dees net currently contain applicable provisions for residential, industrial or commercial development inside a designated vrbari
area)
{VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA® ce hep
43 \s any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
No
C) Yes
JPA. schedule 8, part 1, table 4, hems 1A-1G
IP Requiation, schedule 2, table 2, iten § (vegetation cleaving)
(P Regulation, schedukt 2, table 2, fem 34 (koala conservation)
IP Regutation, schedule 1, part 3, table 4, itan i
Vegetation Managemenl Act 1999, section 22A (veqelation clearingfwild river area}
Wild Rivers Act 2008, sections 31 and 43A
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
44 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with water from a
watercourse, lake or spring (other than under the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a
watercourse?
(k] No
oO Yes - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency
JPA, schedule 8, part 1, table 4, lems 3{a)
IP Requiation, schedule 2, able 2, tem 8
1P Regulation, schedute 1, part 3. table 4 tems 3 and 3A
Water Act 2000, soctinn 966A (wid river area)
Wild Rivers Act 2005, suctinn 43A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.