07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
al Sab a\ED-4NG ~ Benen War phevte Moguavdla\T Or wenge « Ged \CBUNLY_ 61 ESC
An
Fis Kane BAS guy - Consulting 76 out
Yaar SUA HALET
Prat ates 4 O40 BLO
REFER DWG CB0849-C03 LEGEND PROPOSEO EARTHWORKS
ee a 10.5 CONTOURS
(0.2m INTERVALS]
PROPOSED SED
. BASIN CONTOURS
{0.2m INTERVALS)
$
S
ocr acne cn
me Some Sf SILT FENCE
SEQIMENT BASIN DISCHARGE LOCATION
STRAND POST AND
‘WITH SAFETY —o—e—0—o——2—__ 2 STRAND POST & WIRE FENCE
WITH SAFETY HESH
mi ROCK EROSION PROTECTION
CONSTRUCTION EXIT/ENTRY
HA TRAFFIC CLEANING FACILITY
© co—Mee CATCH DRAIN
8 HAY BALE FILTER
LAY TEMPORARY SEQIMENT BASIN
\ HAY BALE FILTERS TO BE SPACED NO MORE t
THAN Sdm APART.
NOTE:-
LOCATION & LEVELS OF ALL EXISTING SERVICES
TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
IT 1S THE CONTRACTOR'S RESPONSIBILITY TO
PERFORM A DIAL BEFORE YOU DIG SEARCH PRIOR
TO COMMENCEMENT OF WORKS
TOTAL CATCHMENT (Al = 2.76ha
ASSUME > 33% OF SOM < 0.020
CONSTRUCTION PHASE SEQUENCE
Crs 05
‘SETTLING VOLUME {Vs} : we ‘ yy wee a o 1. CONSTRUCT SEDIMENT BASIN, SEDIMENT FENCES ANO DIVERSION BUNDS.
ie
SETTLING DEPTH » 1.0m
2. COMMENCE CLEARING AND CONSTRUCT CATCH DRAINS.
BASIN DIMENSIONS AT BASE {42 RATIO)
A
ed 3. COMMENCE FILLING AND EARTHWORKS INCLUQING COMPACTION,
+ 9.00
bt en &, CONSTRUCTION OF STORMWATER LINES AND GULLIES INCLUDING BACKFILLING AND
COMPACTION.
Vs 2 7220!
STORAGE VOLUME « 0.5 x Vs 5. TURF STRIPS 900mm WIDE SHALL BE LAIO TO BASE OF ALL DOWNSTREAM
comets EARTHWORKS BATTERS - AND THE REMAINDER OF THE BATTERS SHALL BE TOPSOILEO
AND GRASS SEEQED IMMEDIATELY UPON COMPLETION OF EARTHWORKS. AND AT THE
SATISFACTION OF SUPERINTENDENT. EIGHTY PERCENT (80%) GRASS COVERAGE SHOULD
BE ACHIEVEO PRIOR TO REMOVAL. SEDIMENT FENCES 10 SE REMOVED AFTER
CONSTRUCTION OF ROADS
16 minutes
» t6tmaZh
G 209
Q sCeiea SEDIMENTATION NOTES
2 085 L/aec
1. ALL SEDIMENT CONTROL DEVICES (SILT FENCES, SPILLWAYS, ROCK CHECK DAMS) TO BE
CHECKED AFTER ALL MAJOR RAINFALL EVENTS AND RECTIFIED AS NECESSARY
WEIR FORMULA: £00 1 166 x bbY
21.328 UE
3 OPUS /N328 4 0.166)
2 thn
ow 2. (F SEDIMENT WATER IS SHOWN TO HAVE SUSPENDED SOLIDS > SOmg/Lt. THEN THE USE OF
A FLOCCULANT IS TO BE APPLIED AS DIRECTEO BY SUPERINTENDENT PRIOR TO THE BASIN
BEING LOWERED.
GATEWAY
CONVEYANCE, THE BASIN (5 TO BE DRAINED 8Y OPENING THE VALVE OR UNPLUGGING THE END OF THE
CATCHMENT AREA + 2.26h0 OUTLET PIPE. ONCE ORAINED THE OUTLET PIPE WILL BE PLUGGED AGAIN.
2 3 ina ooh THE FIELO TEST IS FILL A CLEAR 6Smm SOFT DRINK BOTTLE WITH BASIN WATER
4 tee Ww NOTE:- IF YOU CAN NOT SEE CLEARLY THROUGH THE SAMPLE, THEN A
Os b93am/n 1 FOR DETAILS OF EXISTING GROUND CONDITIONS FLOCCULANT NEEDS TO BE APPLIED.
WEIR FLOW OEPTH « 196mm . REFER TO: THE PH OF THE WATER MUST BE IN THE RANGE 6.5 to 8.5 PRIOR TO DISCHARGE. (F THE
A) REPORT PREPARED BY COFFEY RESULTS ARE OUTSIDE THESE LIMITS THE SUPERINTENDENT 1S TO BE NOTIFIED AND HE
¢ tae wo GEOSCIENCES No. B17974/01-8 DATED WILL ADVISE ON TREATMENT.
> = 106 08.07.2004 .
wor Flow oePTW TZ 3a}em on BI REPORT PREPARED BY DOUGLAS 3. OUTLET BAFFLE - POSTS t00mm - AT Im CRS SET 800mm DEEP WITH SEDIMENT FENCE
PARTNERS No. 33986 DATED 16.08.2006 FABRIC
2) FOR DETAILS OF METHODOLOGY FOR
PROPOSED IN SITU GROUND IMPROVEMENT OF 4. INLET BAFFLE - POSTS 100mm - AT Im CRS SET 800mm DEEP WITH SEDIMENT FENCE FABRIC
THE UNCONSOLIDATED FILL ON THE SITE, REFER WITH 50mm HOLES CUT AT 300mm CRS
TO REPORT BY LANOPAC TECHNOLOGIES No.
P718-O11A) DATED AUGUST 2007. 5. SEDIMENT BASINS TO BE INSPECTED AT LEAST ONCE EVERY WEEK AND DE-SILTED AFTER
EACH MAJOR STORM EVENT OR AS DIRECTED BY SUPERINTENDENT.
® a 2 x to Som 6. THE FINAL LOCATION OF SILTATION AND EROSION CONTROL DEVICES MAY BE ADJUSTED AS
> ——————————— NECESSARY ON SITE BY THE SUPERINTENDENT.
Chit E1 (Design C.PAUNESCU Client
BMD Structoat troheere © com erainesed BUNNINGS GROUP LIMITED
& Project Manegera *,,” Checked _| P-MALONEY | Project
8 | GeOTECrRNCAL NOTES ADDED oH Fat | 16.10.07 ee... Ag 23 Ora 742 682 eS ~ e BUNNINGS WAREHOUSE NOOSAVILLE
’a_| ISSUED FOR APPROVAL Bx | PM | 12.1007 CONSULTING Aaproved Byc| PMALONEY Foe NOT FOR CONSTRUCTION
‘1 | ISSUED FOR COMMENT cP pa | 08.10.07 srerpaie, munsmne Haga = trata PER NG. | 191572 SEDIMENT BASIN 1 AND Drawing No. Rev
No. Amendmants By Appd Oats | No. Amendments by Appt Cate fended O37, ow tat Fae thay scTs «m8 he (07) 3893 1511 Date 09.10.07 ”
: sTeeconea 1 Oftice Cairns Office
THIS DRAWING CANNOT BE COPED OR REPRODUCED IN ANY FORH OR USED FOR ANY OTHER PURPOSE OTHER THAN THAT ORIGINALLY INTENDED WITHOUT THE WRITTEN PERMISSION OF BHD CONSULTING PTY LT9. Lanny cosine mw 207 wawbadten nd, Phe 181) A759 5585. Pre (97) 4035 HUA] Datum AHO. EROSION CONTROL PLAN CB0849-S001| B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.