Skip to the record
The gold standard in government transparency.

Council archive · source document

07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125

of 56

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

1000me SETTLING ZONE
$a0mm STORAGE ZONE

=

SEDIMENT CONTROL BASIN

EMBANKMENT FILL NOTES

1. FILL AREA TO BE STIRPPED OF TOPSOIL AND SURFACE
APPROVED BY GEQTECHNINCAL ENGINEER PRIOR 10 THE
COMMENCEMENT OF FILLING.

2. EMBANKMENT FILL MATERIAL SHALL 8E FREE OF ORGANIC
MATTER, OVERSIZED INCLUSIONS AND ANY DELTERIOUS
MATERIAL SUCH AS TIMBER, STEEL, PLASTIC OR SOIL OF
EXCESSIVELY HIGH MOISTURE CONTENT. THE MAXIMUM
PARTICLE SIZE SHALL NOT EXCEED 1SOmm. FILL TO BE PLACED
IN LAYERS OF 200mm.

3. THE FILL SHALL BE PLACED AND COMPACTED AT OR ABOVE
OPTIMUM MOISTURE CONTENT TO THE FOLLOWING REQUIRMENTS
-MIN DENSITY RATIO 98 % SMOD

-MAX CENSITY RATIO 103% SHDD

-VARIATION OF THE FILL MOISTURE CONTENT 0-2% OF
STANDARD OPTIMUM,

&. THE STRIPPED AREA IS TO GE APPROPRIATELY BENCHED
TO FACILITATE NEAR HORIZONTAL FILL PLACEMENT.

 

oT | EASTNG RORTHING

 

6992139.573 [| -40072.221
4992100.03 | -40088.S55
£912136,04 | -60093.963
137,185 | -40108.099
£912156,195 | -40108.109
astars7.219 | -<0086.026
4912156.579 | -40077.236

 

  

SPILLWAY WITH ROCK PROTECTION
GEOFABRIC UNDER ALL ROCK

 

SOO Rene

 

 

 

 

 

                  

VALVE END OF PIPE

10 BE OPENED ONLY AFTER BASIN
TESTING. TO BE CLOSEO AFTER BASIN
ORAINEO ITYP)

1
REROOPA Te SEbokte

150@ GALVANISED STEEL PIPE
WEIGHTED BASE

ANTI SEEP COLLAR

  

 

 

Naa Mame: aN tpanay - Lamnadtiog ays cit abn Rapeeal ts \E6- HAS - feanngs Worntoune Noeanedte\? Dravnga -CiXtSt

 

SEE OETANL UT-OFF TRENCH S00ma MIN OEPTH 1°)
ACKFILCED WITH (MPEAMEAGLE CLAY uree Peat Sita oe OM
AND COMPACTED TO BASE OF SPLLWAY
Tl
NTS.
jms THICK MASS CONCRETE
"ea 2SMPQ
GRATED MESH TOP
TO PREVENT LITTER 70
OUTLET NEEDLE PUNCHED 2
GEOFABRIC a

 

150® STEEL PIPE RISER
TO TOP OF SEDIMENT
STORAGE ZONE

 

 

seen
‘STORAGE

ZONE

 

 

 

4

 

 

 

  

 

730

NOTE: CONCRETE SURFACE TD BE FIMISHED AS SMOOTH
AS POSSIBLE OM ALL FACES.

CUT-OFF WALL DETAIL

150® STEEL PIPE

MATCH INTO PROPOSED 1 N 3 BATTER

SEOWENT BASIN DISCHARGE LOCATION

MATCH INTO PROPOSED 1 IN 3 SATTER

1m WIDE BERH

REFER TO

SEDIMENT BASIN
r.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCALE 1:20
‘| vinasis SCALE #750 (A1
2 et s Design Chen
i BMD ==: O= BUNNINGS GROUP LIMITED

& Project Manegers Choad 7 :

: ee nou 72 00 703 or = BUNNINGS WAREHOUSE NOOSAVILLE
z
3|_4_ | (SSue0 FOR appROVAL Cee CONSULTING Aoprored Br ro MOT FOR CONSTRUCTION
ie | ews | oa ames oy [os saat gees Pe SEDIMENT BASIN 1 aa
} “Amendments iy ate | 0. Townsville Offite Caicns office [OP PLAN AND DETAIL CB0849-£5¢02) A
i THIS CRAWING CANNOT BE COPIED OR REPROOUCEO IN ANY FORM OR USED FOR ANY OTHER PURPOSE OTHER THAN THAT ORIGNALLY INTENDED WITHOUT THE WRITTEN PERMISSION OF BHD CONSULTING PTY LTD Pr $7) 4759 S855 Pr (07) 4635 HE] Date

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Op Works - Bulk Earthworks [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.