07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
——
A NCE-D4LY - Henn War stovus Nonsanite\? Or means - Grd BEE 91 ESE
wu
Fay ene R\Syonay — Corastogiayt_ cud
nl
SETTLING ZONE—— CENTRE SPILLWAY
pS
| 1
y
FOR DETAILS OF THIS AREA SEE PLANS BY TOD NOOSA CONSULTING ENGINEERS |
25m: CA
——— —4—— OUTLET
i & a PROTECTION
| AREA AS Q
5 NN UW
"2,
3 PLAN VIEW GABION EMBANKMENT
f 2
% SECURE GEOTEXTILE TO GABIONS
‘~ WITH 20MM TO 30MM AGGREGATE
OR OTHER MEANS
25
SEQIMENT BASIN 2x"=]
SEDIMENT STORAGE ZONE NEEDLE-PUNCHED GEOFTEXTILE
SEDIMENT SETTLING ZONE CREST OF SPILLWAY
EE ee fo
——— 0 co
= " + SOOMM . 7 —- "7 OUTLET PROTECTION
—— - | ssamm \_
| TRIRIRIRE
SEDIMENT BASIN | SPILLWAY SECTION NEEDLE-PUNCHED GEOTEXTILE
REFER OWG (€B0849-ESC01 500MM MIN. —
CATCHMENT AREA = 0.40ha DOWNSTREAM ELEVATION
T = 9 minutes
1 = 103mm/h
C2 0.63 .
Q = 7amm/h NOTES:
SETTLING AREA A: 3400 x Q = 265m? 1. REMOVE ALL VEGETATION AND TOPSOIL FROM UNDER THE DAM WALL AND FROM WITHIN, THE STORAGE
SETTLING DEPTH = 0.6m AREA.
BASIN DIMENSIONS AT SURFACE (1.2 RATIO) 2. EXCAVATE TO 300MM DEPTH FOR DAM BASE AND FORM A LEVEL BASE FOR THE GABIONS.
As 275m LINE THE EXCAVATION WITH A NEEDLE PUNCHED GEOTEXTILE ALLOWING SUFFICIENT GEOTEXTILE TO
t 2 Som 3. LINE FROM THE TOE OF THE DAM, UNDER THE WALL, OVER THE UPSTREAM GABIONS AND SPILLWAY TO
D = 0.6m 500MM BELOW THE SPILLWAY EXIT ON THE DOWNSTREAM FACE.
SETTLING ZONE WALL PROFILE AND OUTLET PROTECTION SHALL BE MADE UP OF GABION UNITS FILLED WITH GRADED
D = 0.6m ROCK AS SPECIFIED ON SWMP
Vs = 1h?m &. CONSTRUCT A SPILLWAY SOOMM BELOW THE CREST OF THE DAM AND FOR THE WIDTH SPECIFIED ON
STORAGE VOLUME = 1.0 x Vs THE SWMP.
= Im? S. LAP THE GEOTEXTILE OVER THE UPSTREAM FACE ANDO THROUGH THE SPILLWAY AND FIX IN PLACE
DEPT =_0.55m WITH THE TOP ROW OF GABIONS
6. COVER THE UPSTREAM FACE AND GEOTEXTILE WITH 20MM TO 30MM GRAVEL.
7. PLACE A “FULL OF SEDIMENT” MARKER 70 SHOW WHEN LESS THAN DESIGN CAPACITY OCCURS AND
SEDIMENT REMOVAL IS REQUIRED. :
8. REPLACE UPSTREAM GEOTEXTILE LAYER EACH TIME SEDIMENT IS REMOVED.
a a 16 mM 2 som .
Se ‘
ret +
Alot Date -Ort-BT BEA PM Uner BRAN LLET
SCALE 1:400 1A1}
Chit C.PAUNESCU Client
BMD Fe amet craweesed BUNNINGS GROUP LIMITED
Manegers b P.MALONEY | Project
oe sana 00 103 092 BUNNINGS WAREHOUSE NOOSAVILLE
‘CONSULTING 2] PMALONEY rae NOT FOR CONSTRUCTIO:
Nl
7 [ested FoR POROVAL te | pe tnwe pete, manure head Otfic = Beisbane NPER No. | 191572 SEDIMENT BASIN 2 AND Drawing No Rev
om omni oy | aoe | ow [Re arava oF | fone [ome [rie rar Feasting PON a Law EROSION CONTROL PLAN
THIS DRAWING CANNOT BE COPIED OA REPRODUCED IN ANY FORM OR USEO FOR ANY OTHER PURPOSE OTHER THAN THAT ORIGNALLY INTENDED WITHOUT THE WRITTEN PERMISSION CF BMD CONSULTING PTY LTD. Saeorng Core ete ret we badronna Ph: 07) ATS9 S555. Phy 107) 4035 Aaj Osten AKO. CB0849-€5C03 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗