07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
ye
Ground Engineering Contractors
AUSTRALIA = SOUTH AFRICA ~ EUROPE - CHINA - MIDDLE EAST ~
6 August 2007 Ref: P718AA
The Manager ...
Bunnings Pty Ltd
Level 3 Nexus Building
96 Mt Gravatt Capalaba,
Upper Mt Gravatt
QLD,41 22
Attention: Mr. Paul Pham Email: [email protected]
GROUND IMPROVEMENT .
PROPOSED BUNNINGS | WAREHOUSE~ 180-1 86: Emundi-Noosa Rd.N oosaville’
Dear Sir,
1. INTRODUCTION
Impact compaction has been recommended as a ground treatment means for the improvement
of the existing in-situ Fills for the support of upper level foundations, ground bearing slabs and
external pavements. We understand the 3Ha site is to be developed as a Bunnings
Warehouse..
as
It.is understood that the ‘warehouse building, timber yard and nursery will-be located in the —
. eastern half (Lots 21 and 1), which occupies.an area of about 1.1 hectares. The car park will
be located in the western half (lot 25), which occupies an area of about 2 hectares.
2. INFORMATION PROVIDED
The following information was supplied to Landpac:-
- © Geotechnical Site Investigation Report — Coffey. Geosciences (Ref: B17974/01- B dated 8
“July 2004) -
= Geotechnical Site Investigation Report - Douglas Partriers (Ref: 33984 dated 16 August
2006) .
Site Plan — John R. Brogan & Associates Drg No: 1096-03-P2
* Detail and-Contour Survey - MM PMM Group Plan No. 7050-01 B -
* Bulk Earthworks Plan — Cardno (Qld) Pty Ltd Drg No 3501/54/01-001
The Coffey's site history reported that 5,000m* of fill was placed on the third lower tier of
the planned warehouse area and reported Bore 4 as having 1.1m of Fill: sandy gravel,
clay and gravely clay. However, the more recent Douglas Partners logs in the same area
teported no fill. For the purposes of this proposal we have assumed there is about 1m of fill,
as described above, over the lower tier... .
The Douglas Partners report. summarizes there is up to 1.6m of fill in the southeast third of *
the site and up to about 6m of fill in the reminder of the site. The upper part of the fill is -
reported to be ‘clean fill’ comprising of sand, clay and gravel. The deeper areas are report to
comprise of 25 to 50% of building demolition materials including timber, bricks, concrete,
steel sheeting, wire, plastic, tyres and tree roots. However, test pits 4, 8 and 9 show the
‘building demolition’ material is present from the existing surface.
ABN. 12.069 528 696 _
PO BOX 132, SEVEN HILLS, NSW 1730, [email protected] FAX: (02) 9838 8162
Sydney-{02) 9838 7044; Brisbane-(07) 3832 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690
DIRECTORS: E J COOK, T R COOK, K T McCANN ©
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.