Council archive · source document
07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
| Ground Engineering Gontractars . RUsSTRAUA= SOUTH-AFRIGA- EuROPE~ CHINA- MIDDLE EAST “The contour survey and. bulk earthwork ‘drawings. indicate that. the northern end ‘of the - warehouse building ‘area (lower tier) requires approximately 1.8 to 2.8 metres of fill with approximately 2.5 to 3.5 metres of cut on the southern end of the warehouse building area (upper tier). It appears from the drawings that external car park area will require fill over the northern 4/5 or so ranging from 0 to 1.5 metres on the upper tier and 2 to7 metres in the lower north-west corner. 3. ENGINEERING ASSESSMENT. Building Area us ‘It is assumed that the apparent existing fi fill on the tower tier of the building area is un- engineered and will require impact compaction. Once the ground improvement works proposed below have been conducted, the building structures may be supported on high level footings proportioned for an allowable bearing pressure of 150kPa. A ground floor slab design may be adopted for estimated loads of 20 kPa. The existing and new engineered fill underlying the building area will range in thickness from zero to about. 3m. The estimated post construction total and differential settlement of the pad footings and ground floor slab is about 10mm. ‘ . Car Park Area The fill material underlying the car park area is variable in thickness and composition. The new engineered fill and proposed impact Compaction of the in-situ fill will create a raft - of stiff material which will even out potential differential settlements which are likely to be caused by deep variable fill. Settlement estimates computed by Landpac’s geotechnical engineer show that if 3m of new fill is placed on 6m of Impact Compacted in-situ fill, with an assumed Young’s modulus value of 3:to 5 MPa, a total’settlement of about 50 to 100mm can be expected. The assumed Young's modulus values given to the ‘in-situ fill are very conservative and allow for the variability of the in-situ fill. It is considered that after Deep Impact compaction and placement of new engineered fill it is expected the. proposed car park will perform adequately. 3.1 Ground Improvement Works: Car Park Area It is proposed that once the site has been cleared to: e Place fill(by others) in the north-west corner in one layer to.RL13.5 e Conduct Deep Impact. Compaction with extensive monitoring of the compaction — "settlement on the north-west corner.and’ ‘existing levels prior to the placement of new fill to BEL. e’ Place excavated and imported fill (by others) to BEL ih accordance with AS3798 — “Guidelines on earthworks for commercial and residential developments’. 3.2 Ground Improvement Works: Building Area Iti is proposed that once the site has been cleared to:. ¢ - Conduct Impact Compaction on the areas requiring placement of new fill prior to the placement of new fill to BEL. « Excavate the cut areas and place fill (by others) to BEL in one layer followed by impact compaction « Impact Compact whole building footprint to ensure uniformly stiffened platform : A.B.N. 12 069.528 696 PO BOX 132, SEVEN HILLS, NSW 1730, aroundimprevement@landpsc. com.au FAX: (02) 9838 8162 Sydney-(02) 9838 7044; Brisbane-07) 3632 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690 “DIRECTORS: E J COOK, TR COOK, KT MECANN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.