Council archive · source document
07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
pore © Ground Eagineering Contractors AUSTRALIA ~ SOUTH AFRICA ~ EUROPE - CHINA - MIDDLE EAST To allow the use of upper level footings the Impact Compaction will need to be applied in an “Engineered” manner. Engineered Impact Compaction involves extensive GPS based monitoring and control of localised compaction settlement and soil response measurement. This is generally used on variable fill sites and allows the identification of localised areas with higher settlement compression and/or deleterious material. Soil- response measurement will also assist _ ‘in the identification’ of weak sub-surface niaterials that may adversely affect footing performance. Impact Compaction applied in an “engineered' manner using extensive settlement ‘and soil response monitoring provides a much higher level of confidence and allows the use of slab-on-ground construction and upper level footings with more realistic design parameters. 3.3 Site Specific Conditions and Discussion Following the clearing of the vegetation, buildings, equipment and rubble on site impact compaction could be applied on: the lower ‘tier of the building area with minor further site preparation. J / : a oo, . . : e The following methodology is proposed:- , oO a i) Site clearing ii) Excavation of cut areas in. building area and placement of fill in north-west corner in one layer . . iii)’ Impact Compaction of existing fill on lower tier of building area =~ iv) Deep Impact Compaction of Car Park area - : v) Excavation of cut areas in building area and placement of fill in fill areas in building area. in one layer : vi) Impact Compaction of whole building pad. vii) Trim building pad to BEL | viii) Importation and placement of fill . Car Park to BEL : With variable un-controlled fill sites, localised soft areas with un-compactable deleterious aac : “ material may become evident during the works. ‘Depending, on the nature and location of the . Soft areas, it may be-necessary to excavate and replace the material with suitable: fi It. This has .not béen-allowed for in the quotation. . . . Airborne dust during the Impact Compaction works will need to be suppressed with a water cart. This has been allowed for in the quotation. . AB.N. 12 069 528 696 - “PO BOX 132, SEVEN HILLS, NSW 4730, “groundimprovemerii@landpac. com.au FAX: (02). 9838 8162 - Sydney-(02) $838 7044; Brisbane-(07) 3832 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690 DIRECTORS: E J COOK, T R COOK, KT McCANN se
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.