pore ©

 

 

 

Ground Eagineering Contractors

 

AUSTRALIA ~ SOUTH AFRICA ~ EUROPE - CHINA - MIDDLE EAST

To allow the use of upper level footings the Impact Compaction will need to be applied in an
“Engineered” manner. Engineered Impact Compaction involves extensive GPS based
monitoring and control of localised compaction settlement and soil response measurement. This
is generally used on variable fill sites and allows the identification of localised areas with higher
settlement compression and/or deleterious material. Soil- response measurement will also assist _
‘in the identification’ of weak sub-surface niaterials that may adversely affect footing
performance. Impact Compaction applied in an “engineered' manner using extensive settlement
‘and soil response monitoring provides a much higher level of confidence and allows the use of
slab-on-ground construction and upper level footings with more realistic design parameters.

 

3.3 Site Specific Conditions and Discussion

Following the clearing of the vegetation, buildings, equipment and rubble on site impact
compaction could be applied on: the lower ‘tier of the building area with minor further site

preparation. J / : a oo, . . : e
The following methodology is proposed:- , oO a

i) Site clearing

ii) Excavation of cut areas in.
building area and placement of
fill in north-west corner in one
layer . .

iii)’ Impact Compaction of existing fill
on lower tier of building area =~

iv) Deep Impact Compaction of Car
Park area - :

v) Excavation of cut areas in
building area and placement of
fill in fill areas in building area. in
one layer :

vi) Impact Compaction of whole
building pad.

vii) Trim building pad to BEL |

viii) Importation and placement of fill .

Car Park to BEL :

 

With variable un-controlled fill
sites, localised soft areas with
un-compactable deleterious aac : “

material may become evident during the works. ‘Depending, on the nature and location of the
. Soft areas, it may be-necessary to excavate and replace the material with suitable: fi It. This has
.not béen-allowed for in the quotation. . . .

 

Airborne dust during the Impact Compaction works will need to be suppressed with a water cart.
This has been allowed for in the quotation. .

AB.N. 12 069 528 696 -

“PO BOX 132, SEVEN HILLS, NSW 4730, “groundimprovemerii@landpac. com.au FAX: (02). 9838 8162
- Sydney-(02) $838 7044; Brisbane-(07) 3832 7666; Perth-(08) 9421 1644; Melbourne-(03) 9525 5690
DIRECTORS: E J COOK, T R COOK, KT McCANN

  

se

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Op Works - Bulk Earthworks [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.