())] Dougtas Partners
Oaetrcheies + feriraearent! - Growstester

 

 

 

 

Page 12
Table 7 — Earth Pressure Coefficients (non sloping crest backfill)
Material Unit Ky K,
. ot . Weight. (braced *(unbraced
_ ao et: (kN/m®)- structure) _|_ structure)
Controlled fill, stiff or very stiff silty clay 20 - 0.60 0.45
Very low strength claystone and siltstone 20 0.35 0.20

 

 

 

 

 

 

° Passive resistance at the toe should. be ignored in the zone where future disturbance (eg.
services trenches) could occur.

. Due allowance should be made for surcharge loadings (over and above the lateral earth
pressure coefficients presented above) where the fini inished ground level above retaining walls
_is above horizontal and where additional loading igtikely to be applied from existing or future
upslope structures; or from: traffic: *: . . .

eit is recommended that provision be madé’in design folabuild-up of hydrostatic pressure
behind the wall, as described above, unless full wall heigh drainage is installed behind the
wall. Drainage material behind the wall (as ‘above)Should be ingtalled for the full height of the
wall, for a width of at least -0. amfbe, free dratding and granular? and have a perforated or
slotted drainage pipe at the heel of thevwall.

 
     
 
 
 

iS, report Can be adopted for retaining

. Allowable bearing press: in
ae ye one-third to allow for the effects of the

~ wall strip footings provided.
lateral thrust from the wal

7.11 Pavements ani

The results of the soakedtCGBR 18 its condticted on selected subgrade samples of the clay filling
indicate subgrade CBR values, of 3% and 4%, and it is recommended that a design CBR value of
3% be adopted for design. For rigid pavements and slab on ground, a modulus of subgrade reaction
(k) of 25kPa/mm or a soil mecutgena for short term load and 1SMPa‘ for long term load could
be used for design.

These values are estimated to be close to a lower bound value for these. materials and are based on
the assumption that. the topsoil will 'be stripped prior to pavement construction. It is also contingent
upon adequate site preparation by proof rolling (to detect any unsuitable soft or loose material) and
subgrade compaction to a minimum density ratio of 98% Standard,

Ground conditions can vary and it is-recommended that the CBR value be confirmed by sampling
and testing during construction.

The above recommendations are based on the provision and maintenance of adequate s surface and
subsurface drainage. °

On-ground building and basement floor slabs ‘(ie. floating slabs) should be detailed so they can
move independently of any pile supported elements of the building. Dowelling of floor slabs will
minimise differential movements between adjacent slabs.

For loaded areas of different Proportion or different load intensity to standard wheel loads, DP
should be contacted for further advice. .

 

Report on Geotechnical invesiipation . : oe : . Project 33984
Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville . my fo 16- August 2006

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Op Works - Bulk Earthworks [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.