Table 6 - Footing Design Parameters
Material Strip and Pad =| ‘Allowable Shaft Allowable End
Footings (kPa) Adhesion Bearing Pressure
(kPa) : (kPa)
Stiff clay,-medium dense sand, 150 15 NWA
controlled fill : ,
Very stiff and hard clays 300 “25 400.
Extremely tow strength claystone| °° 450 —- . 30 500 .
and siltstone _ : _ : . _ a
4 Very low strength .claystone and * 600 35 600
siltstone .

 

 

 

 

 

 

Bored piles should extend through filling and found in eit hard clays or weathered claystone and
siltstone at depth. Bored piles should found a minimumPofttwo to three pile diameters and can be
designed using the allowable parameters indicated/in the tablétabove.

These values. have been calculated using a facta of safety of 2.5.Where.limit state methods are to
be used to design the piles, the factoréd design geotechpical strength, (R",) can be calculated: by
multiplying the allowable value’ by the safety factor (t-determine ultimate values), and applying a
suitable geotechnical strength reduction factor(>,). Where,no-pile testing is carried out, a 4, value of
0.5 is suggested. . :

    

Ground conditions can vary, it is essential pat piléjexcavations be inspected by experienced
Douglas Partners geotechnical personnel to ensure the ground conditions agree with the design
assumptions and to ensure, that theye Seno, soft onloose material remaining at the base of the
excavations, or smeatjon the oo . . a
Experience ‘indicates thatybored Riles (loaded as per the table above) are likely: to undergo
settlements in the order of 1%zto 2% ‘of, the pile diameter.

Although no groundwater ingressywas encountered during the field investigation, groundwater
conditions can vary, and some ingress ‘into pile excavations might be encountered during
construction, requiring appropriate management.

7.10 Retaining Walls

At the time of the investigation, it was not known where; arid to: what. height retaining walls were
‘ proposed to:be constructed. .In.general, however, it is recommended that all retaining structures be
engineer-designed and constructed to adhere to the following loads and procedures:

* ~ ‘Active’ earth pressure conditions should be adopted where the retaining structure is not
braced. Where the structure is braced from lateral or rotational movements, ‘at rest’
conditions (K,) should-be adopted.

° Depending upon the material to be retained behind the wall, the lateral pressure coefficients
given in the following table are recommended for design. The factors for clay include ‘some
allowance for limited swell pressures exerted by the retained soils. The tabulated values are
_unfactored. . : oS

 

Report on Geotechnical investigation Project 33984
Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville . 16 August 2006

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Op Works - Bulk Earthworks [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.