Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125

of 56

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

a L

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
IPA, schedule 8, pa i
JP Regulation, schedule 2, tabi
IP Regulation. schedule 1. tabi
Water Act 20t
Wild Rivers

  

en TT
}. tom 2 (wild river area)

 
 

 
  
 
 
 

 

ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA =.

 

 

1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

No
C) Yes

IPA, schedule 8 part 3, table 2, item

IPA, schedule 8 part 7, table 3. tems 3 and 4

IP Requiation, sehedule 2, table 2, items 1 and 23

Environmenial Pratecuon Act 1994, section 73AA (evil river area)
Wild Rivers Act 2005, section 434

WITHIN THE LIMITS OF A PORT ~

 

 

1.4 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?

[x] No

@ oo
JP Regulation, schedule 2, table 2, tems 15 and 16

 

 

(DECLARED FISH HABITAT AREA T= ee ee

  

1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

—K) No

(C1 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation, schegute 2. table 2. item 26
COMMUNITY INFRASTRUCTURE ©
41.6 ls any part of the premises designated for community infrastructure?

No
C1 Yes

JP Requiation, schedule 2, table 3, item 7

LI Sa

 

     

a a Geo Ge be RR lene We ape

 

 

 

[WASTE WATER MANAGEMENT:

 

@ 17 Does the proposal involve the establishment or expansion of a waste water disposal system?

No
(1) Yes

IP Regulation, schedule 2, table 2, item $

    
 

ISEGTION 4 Section’ must be completed when the application seeks approval to carry out operational, work:
PLANNING SCHEMES re. gn aa. : — on

 

   

ae Ree: Geer

41 Is any of the proposed operational work assessable under a planning scheme?
(1) _No- Goto Question 4.2 below
Yes - Complete Part E of IDAS Application Form 1 and Questions 4.1.1 - 4.1.8 below

 

STATE-CONTROLLED ROAD
4.1.1 Is any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
(1 No

Yes

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Op Works - Bulk Earthworks [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.