Council archive · source document
07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
a L
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
IPA, schedule 8, pa i
JP Regulation, schedule 2, tabi
IP Regulation. schedule 1. tabi
Water Act 20t
Wild Rivers
en TT
}. tom 2 (wild river area)
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA =.
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No
C) Yes
IPA, schedule 8 part 3, table 2, item
IPA, schedule 8 part 7, table 3. tems 3 and 4
IP Requiation, sehedule 2, table 2, items 1 and 23
Environmenial Pratecuon Act 1994, section 73AA (evil river area)
Wild Rivers Act 2005, section 434
WITHIN THE LIMITS OF A PORT ~
1.4 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
[x] No
@ oo
JP Regulation, schedule 2, table 2, tems 15 and 16
(DECLARED FISH HABITAT AREA T= ee ee
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
—K) No
(C1 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schegute 2. table 2. item 26
COMMUNITY INFRASTRUCTURE ©
41.6 ls any part of the premises designated for community infrastructure?
No
C1 Yes
JP Requiation, schedule 2, table 3, item 7
LI Sa
a a Geo Ge be RR lene We ape
[WASTE WATER MANAGEMENT:
@ 17 Does the proposal involve the establishment or expansion of a waste water disposal system?
No
(1) Yes
IP Regulation, schedule 2, table 2, item $
ISEGTION 4 Section’ must be completed when the application seeks approval to carry out operational, work:
PLANNING SCHEMES re. gn aa. : — on
ae Ree: Geer
41 Is any of the proposed operational work assessable under a planning scheme?
(1) _No- Goto Question 4.2 below
Yes - Complete Part E of IDAS Application Form 1 and Questions 4.1.1 - 4.1.8 below
STATE-CONTROLLED ROAD
4.1.1 Is any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
(1 No
Yes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.