Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125

of 56

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
If yes, is all of the proposed operational work associated with the following?

A material change of use that is assessable under the planning scheme (k] No 0 Yes
Reconfiguring a lot that does not increase the total number of lots and does not increase No mY
the total number of lots abutting the State-controlled road es

ifno to either or both - Answer (a) - (c) below.

(a} Is any of the proposed operational work associated with access to a State-controlled road?

(1 No

O Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

{b} 's any of the proposed operational work for filling or excavation?

(No
CL] Yes

{c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from
the land, through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a
_State-controlled road?
(1 No
oO

Yes

1P Regulation, schedule 2. table 3, item 3
IP Regulation, schedule 2, table 3, item ib)

ACID SULFATE’SOILS

 

4.1.2 Is any of the operational work proposed in a local government area listed? in State Planning Policy 2/02: Planning and
Managing Development Involving Acid Sulfate Soils?

No
OO Yes
Spurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Caoloola, Douglas,

Fitzray, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

1P Regulation, schedule 2, table 3, item 4
State: Planning Policy 2/02: Planning and Managing Duvelopment involving Acid Sultate Sods, section 3.6

EASEMENTS AND SUBSTATIONS

 

4.1.3 Is any of the proposed operational work for filling or excavation?
(1) No
e Yes
If yes, is the filling and excavation associated with reconfiguring a lot?
Yes

(1 No - Answer bath (a) and (bh) below

IP Regulation, schedule 2. table 3 item 10{a)
JP Regulation, schedule 2, table 3. tant 10(h}

4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 4 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No
CI Yes

IP Regulation, schedule 2, lable 3. iter 1?

   

PUBLIC PASSENGER TRANSPORT,

4.1.5 Is any of the proposed operational work listed in schedule 13C of the integrated Pianning Regulation 1998 and does it exceed the
specified threshold?

No

(J Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.

JP Requiation, schedule 2, table 3, tem 14

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Op Works - Bulk Earthworks [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.