Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Information Request OPW23 0182 · OPW23/0182

of 2

Text shows just the words. Original shows the document exactly as it was published.

                 The construction works in the road reserve appear to have changed the verge area levels and
                 have impacted (2 dead tress) or have the potential to impact on existing vegetation that was
                 to be retained in the conditions of DBW21/0026.
                 Information Required
                 4.      Provide landscaping plans for the verge areas in the frontage of the site. The plans must
                         be prepared by a suitably qualified person and include but not be limited to:
                         4.1. Existing trees to be retained/replaced,
                         4.2. Protection measures for the retained trees,
                         4.3. Plans for the disturbed areas of the verge within the frontage of the site. The plans
                              must be in accordance with Council’s Planning Scheme Policy PSP 2 –
                              Landscaping,
                         4.4. A design that considers existing services (overhead and underground), and
                         4.5. A layout that is consistent with the proposed driveway design
                 Issue
                 There appears to be potential conflicts between the proposed drainage line connecting from
                 the site to the Council pit in Maher Tce and existing services (power poles) and vegetation in
                 the road reserve.
                 Information Required
                 5.      Indicate on the plans the location of any existing services and vegetation in the proximity
                         of the proposed drainage line between the site and the Council pit in Maher Tce. Where
                         in close proximity provide clearance distances in accordance with the service authorities
                         standards.
                 3.      DUE DATE FOR RESPONSE TO INFORMATION REQUEST

                 The due date for providing the requested information is 21 March 2024. Email your response
                 to [email protected]. Please advise Council of your response to this information request
                 in accordance with section 13 of the Development Assessment Rules.
                 If you do not provide a response before the due date, it will be taken as if you have decided
                 not to respond to the information request and Council will continue with the assessment of
                 your application.
                 4.      OTHER DETAILS

                 You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
                 Services” page can be accessed via "Quick Links" on the left hand side of the screen.
                 Should you have any further queries in relation to the above, please do not hesitate to contact
                 me on the number above.
                 Yours faithfully,




                 Mark Lewis
                 Coordinator Engineering




                                                                                                            Page 2 of 2
Document Set ID: 22743010
Version: 2, Version Date: 21/12/2023

Used in these records

About this file

File size
88 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Information Request OPW23 0182.pdf · 88 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.