Attachment E - Previous Extension to Currency Period 5-10-18

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Noosa Council documents




                      Approved Plans
               21.    Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed within this Decision Notice.
               3.     All lot numbering on the subdivision plan to be submitted to Council for compliance
                      assessment must remain as shown on the Approved Plans.
                      Boundary Encroachments
               4.     Certification must be submitted to Council from a Licensed Surveyor which certifies that:
                      (a) the boundary clearances for any existing buildings remaining on the site comply with
                             the relevant provisions of the planning scheme and the Building Act 1975, unless varied
                             by this Decision Notice
                      (b) all constructed access and roadworks (including associated fill batters and retaining
                             walls) are fully contained within a dedicated reserve or registered easement
                      (c) all existing and proposed utility services and connections (eg. electricity,
                             telecommunications, water, sewerage) are wholly located within the lot they serve, or
                             alternatively included within an easement where location within the lot is not possible
                      (d) deleted
                      (e) all dams (including ponded water, dam walls and associated spillway structures) are
                             wholly located within the boundaries of a single lot
                      (f)    all retaining walls and structures are fully contained within the lot they retain
                      (g) any fill, including fill batters, are wholly contained within the subject site and not on
                             adjacent properties
                      (h) deleted.
                      Landscaping
               5.     Native street trees shall be established at 10 metre centres within the footpath reserve along
                      the frontage of Lot 103 and shall have a minimum pot size of 45 litres.
                      Vegetation Clearing
               6.     Vegetation clearing is not authorised by this approval and shall only be undertaken in
                      association with an appropriate development approval.
               ENGINEERING
                      External Works
               7.     Gateway Drive must be upgraded for the length of its frontage to the subject site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular the construction of a pedestrian footpath in accordance with the conditions of this
                      Decision Notice. This condition is imposed pursuant to s665 of the Sustainable Planning Act
                      2009 being non-trunk infrastructure.
                      Pedestrian and Bicycle Facilities
               8.     Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with an Operational Works approval and must include in particular
                      a 2 metre wide footpath within the road verge extending from the end of the existing pathway
                      in Gateway Drive to the northern boundary of proposed Lot 103. This condition is imposed
                      pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure.
                      Stormwater Drainage
               9.     The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval and must include in particular:
                      (a) A connection point for the future development of proposed Lot 103 to the existing
                           stormwater drainage system



                                                                                                        Page 2 of 8
Document Set ID: 20709606
Version: 4, Version Date: 05/10/2018                                                             Print Date: 5 October 2018, 11:29 AM
Log in to download the original file

Attachment E - Previous Extension to Currency Period 5-10-18.pdf · 217 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.