Original source · versioned page text
Attachment E - Previous Extension to Currency Period 5-10-18
Noosa Council documents
Approved Plans
21. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed within this Decision Notice.
3. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
Boundary Encroachments
4. Certification must be submitted to Council from a Licensed Surveyor which certifies that:
(a) the boundary clearances for any existing buildings remaining on the site comply with
the relevant provisions of the planning scheme and the Building Act 1975, unless varied
by this Decision Notice
(b) all constructed access and roadworks (including associated fill batters and retaining
walls) are fully contained within a dedicated reserve or registered easement
(c) all existing and proposed utility services and connections (eg. electricity,
telecommunications, water, sewerage) are wholly located within the lot they serve, or
alternatively included within an easement where location within the lot is not possible
(d) deleted
(e) all dams (including ponded water, dam walls and associated spillway structures) are
wholly located within the boundaries of a single lot
(f) all retaining walls and structures are fully contained within the lot they retain
(g) any fill, including fill batters, are wholly contained within the subject site and not on
adjacent properties
(h) deleted.
Landscaping
5. Native street trees shall be established at 10 metre centres within the footpath reserve along
the frontage of Lot 103 and shall have a minimum pot size of 45 litres.
Vegetation Clearing
6. Vegetation clearing is not authorised by this approval and shall only be undertaken in
association with an appropriate development approval.
ENGINEERING
External Works
7. Gateway Drive must be upgraded for the length of its frontage to the subject site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular the construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice. This condition is imposed pursuant to s665 of the Sustainable Planning Act
2009 being non-trunk infrastructure.
Pedestrian and Bicycle Facilities
8. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular
a 2 metre wide footpath within the road verge extending from the end of the existing pathway
in Gateway Drive to the northern boundary of proposed Lot 103. This condition is imposed
pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure.
Stormwater Drainage
9. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
(a) A connection point for the future development of proposed Lot 103 to the existing
stormwater drainage system
Page 2 of 8
Document Set ID: 20709606
Version: 4, Version Date: 05/10/2018 Print Date: 5 October 2018, 11:29 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original