Council archive · source document
Request for Further Information - 010.2007.00002398.001 [As Published] · 132007.2398
28. Please provide assessment of the impact of the development on the traffic
generations within the Cooroy Township CBD including and not limited to Elm
Street/Myall Street and Maple Street/Garnet Street intersections.
Stormwater Quality Management Assessment
29. Please demonstrate that the discharge from the site will not be worsened for any
event up to Q100.
30. Please provide further justification of the existing water quality parameters
assumed as the site at present has good cover and is does not reflect a normal
orchard scenario.
31. In regards to the music model there is no information as to the pollutant removal
efficiencies of the selected treatment devices such as the C* value. This is
needed to determine if modelling of an water quality control ponds is appropriate.
32. The Music model has been based on BCC 2003 guidelines because there are no
MUSIC guidelines for Noosa available. Why have the more recent GCCC 2006
guidelines been neglected when they are the only available guidelines which
prescribe pollutant generation rates for roads, roofs and other areas which is how
this particular model appears to have been delineated.
Waste Management
33. Waste management shall comply with Council’s Planning Scheme Policy PSP9
Waste Management. The proposal appears unsatisfactory in regard to the
following:-
33.1. Demonstrate that the internal road network can cater for refuse vehicles if
individual on-site collection is proposed. Alternatively a central waste
disposal area is provided within the site that allows for a refuse vehicle to
enter and exit the site in forward direction without creating an unsafe
situation for staff, residents and visitors of the site.
33.2. A waste storage facility shall be provided for the Community building.
33.3. Demonstrate that the waste storage facilities at Residential Aged Care
building, Community buildings and nodals are large enough to store waste
and recycle bins.
33.4. The location of bin wash down facilities are required to be shown on the
proposal plans.
Please provide six (6) copies of all information that you are providing. In addition, it
would assist Council if you could also provide an electronic copy of your response.
Please be aware that under Section 3.2.12 of the Integrated Planning Act, the applicant
is to respond to any information request within 12 months of the request or otherwise,
the application lapses.
Under the provisions of the Integrated Planning Act 1997, you as the applicant, have
three options available in response to this Information Request. You may give the
assessment manager (in this instance Council) and each referral agency (if any):-
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2007.00002398.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 25 KB (small file)
- File type
No other editions are linked here.