Original source · versioned page text
2016-07-18 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 18 JULY 2016
Page 7 of 41
GENERAL COMMITTEE MEETING AGENDA 18 JULY 2016
5
Attachment
2
Noos ounc Flood Management A on Plan
~O Cc
Noosa Council, residents and businesses have access to the best available flood information for the region; Information on past, present and future flooding conditions is available and utilised to inform planning and decision making; Council’s
Desired Outcome flooding resources are up to date, reflect local conditions and take account of existing and future climate; Flood management and distaster managment activities are well planned, coordinated and communicated across all stakeholders; Services
are delivered that help protect the community, improve community resilience and improve public access to information.
Core Area Core Principle Action Item Prioritisation Responsible stakeholder Next steps Budget Status Icon
Include flood contour mapping layers with anticipated
To make flood mapping accessible, 1%AEP (future climate, 2100) flood levels and associated Update Exponare once Noosa River Flood Study
Flooding Resources Flood mapping 2016-18 GIS Officer, ICT Included in operational budgets Underway @
informative and relevant minimum floor levels on Council’s internal mapping complete and new MFL and flood contours available
system for officer access only.
Include flood mapping layers for 1% AEP future climate
To understand existing and future
Flooding Resources Flood mapping 2100 flood extents and depths to Council’s Interactive 2016-18 GIS Officer, ICT Add once planning scheme gazetted Included in operational budgets Scheduled oa
flooding conditions
Mapping Portal and internal mapping system.
Establish an annual budget allocation for the
To understand existing and future
Flooding Resources Flood studies management and technical support of Council’s flood 2016-18 Principal Strategic Planner Budget has been allocated for flood consultant services. $20000 budgeted for 16/17 Ongoing
flooding conditions
planning related data and advice.
Review related SCC documents and prepare a Noosa
Flood records and Develop a guideline for the collection and storage of specific guideline to inform when flood related field
Flooding Resources To learn from the past 2016-18 Asset Planning Coordinator To be referred for consideration in 17/18 budget Not started
survey flood related field data. data should be collected and how it should be collected
and stored.
Establish a regular maintenance program and
Flood records and Coordinate an inspection of all Noosa Council MHGs and
Flooding Resources To learn from the past procedures for Council’s Maximum Height Gauges 2016-18 Asset Planning Coordinator Included in operational budgets Scheduled
survey undertake basic maintenance before September 2016.
(MHGs).
Confirm triggers and procedures for reading and
Flood records and Identify local triggers to prompt the reading of each
Flooding Resources To learn from the past maintaining Council’s network of Maximum Height 2016-18 Asset Planning Coordinator Included in operational budgets Not started
survey MHG
Gauges.
Establish procedures and protocols for storing historical
Flood records and
Flooding Resources To learn from the past flood levels, including data collected from MHGs and 2016-18 Asset Planning Coordinator To be referred for consideration in 17/18 budget Not started
survey
debris survey.
Determine best method for storing the information and
Flood records and Incorporate all available historical flood level data into whether it should be made available publically on
Flooding Resources To learn from the past 2016-18 GIS Officer, ICT Included in operational budgets Completed
survey an accessible GIS environment. Council's interactive mapping portal as well as through
the internal flood informaiton repository.
Review the custodianship and management of Council's
To understand existing and future flood study data (including spatial flood data files) with
Flooding Resources Flood studies 2016-18 Principal Strategic Planner Discuss with Flood Working Group Included in operational budgets Scheduled
flooding conditions the view of establishing a clear point of contact with
regards to flooding information
Upgrade the Noosa River flood model to a
contemporary 2D modelling platform and where
To understand existing and future $120000 committed for 15/16 ($40,000 carryover for
Flooding Resources Flood studies possible, improve the model calibration and extend the 2016-18 Principal Strategic Planner To be completed 2016/17 financial year Underway
flooding conditions 16/17 FY)
model to cover the major watercourses and floodplains
to and beyond Kin Kin.
Explore the potential effects of flood flow and tidal
Noosa River Flood Study Upgrade is underway including
velocity distributions within the lower reaches of Noosa
To understand existing and future ome work on erosion and velocity distributions.
Flooding Resources Flood studies River with regards to foreshore erosion and evaluate the 2016-18 Project Manager Planning and Infrastructure To be referred for consideration in 17/18 budget Scheduled
flooding conditions Consider what additional work may be required to
cause and effect of the erosion and potential mitigation
investigate potential erosion mitigation strategies.
strategies.
Include flood mitigation modelling for Daintree Estate,
To understand existing and future
Flooding Resources Flood studies Cooroy Creek and Coorora Creek for all design flood 2016-18 Principal Strategic Planner Check all information properly stored Included in operational budgets Underway
flooding conditions
events in Council's Flood Information Repository
Update disaster management flood mapping series for
To make flood mapping accessible, Update disaster management mapping once Noosa
Flooding Resources Flood mapping Daintree Estate, Cooroora Creek and Cooroy Creek to 2016-18 Disaster Management Officer Included in operational budgets Scheduled
informative and relevant River flood study complete
reflect flood mitigation works.
Noosa Council FMP Implementation Plan.xisx Page 1 of 4 13 16
Page 7 of 41See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.