Noosa Council Flood Management Action Plan
Noosa Council, residents and businesses have access to the best available flood information for the region; Information on past, present and future flooding conditions is available and utilised to inform planning and decision making; Council's
Desired Outcome flooding resources are up to date, reflect local conditions and take account of existing and future climate; Flood management and distaster managment activities are well planned, coordinated and communicated across all stakeholders; Services
are delivered that help protect the community, improve community resilience and improve public access to information.
Core Area Core Principle Action Item Prioritisation Responsible stakeholder Next steps Budget Status Icon
Determine flood trigger levels and the likely associated
consequences for vulnerable communities or vulnerable Identify local flood triggers reference levels in
Disaster Management Disaster preparations To be prepared for flood events 2016-18 Project Manager Planning and Infrastructur Included in operational budgets Underway
infrastructure items with reference to one (or more) of consultation with LDMG.
the Council’s radio telemetry gauges.
Disaster Management Disaster preparations To be prepared for flood events Maintain all radio telemetry gauges on a regular basis. 2016-18 Asset Planning Coordinator Identify next data for maintainance Included in operational budgets Not started
Review gauge translations in Enviromon every two years
Disaster Management Disaster preparations To be prepared for flood events to ensure accurate real world conditions are being 2016-18 Asset Planning Coordinator Review gauge translations in Enviromon Included in operational budgets Not started
reported.
Review standard procedures for receiving and providing
Ensure systems that provide access to flood information
flood advice during a flood event to identify critical
or communication between flood advisors and LDMG
Disaster Management Disaster preparations To be prepared for flood events systems within this process. 2016-18 Asset Planning Coordinator To be referred for consideration in 17/18 budget Not started
have redundancy options in the event of some failure of
Identify and where appropriate implement redundancy
the system during a flood.
options and alternative proceedures for these critical
Establish a user group with basic proficiency in the Ensure flood Working Group maintains a record of
Disaster Management Disaster preparations To be prepared for flood events operation of the Enviromon system and a user group 2016-18 Disaster Management Officer officers with basis and advanced proficiencies in Included in operational budgets Scheduled
with advanced proficiency in the system. Environmon.
Ensure Flood Working Group maintains a record of
Provide at least four relevant officers with basic
officers who have been provided basic competency
Disaster Management Disaster activation To be prepared for flood events competency training in hydrologic and hydraulic 2016-18 Disaster Management Officer Included in operational budgets Scheduled
training in hydrologic and hydraulic characteristics of
characteristics of the Noosa Council catchments.
the Noosa Council catchment.
Provide specific flood related disaster management
training to relevant council officers, or stakeholders, Include disaster management training on the agenda for
Disaster Management Disaster activation To be prepared for flood events 2016-18 Disaster Management Officer To be referred for consideration in 17/18 budget Not started
independent of broader disaster management training the Flood Working Group
exercises, to further refine specific flooding related skills.
Establish remote access to Enviromon and Council’s suite
Disaster Management Disaster preparations To be prepared for flood events of disaster management flood maps for relevant council 2016-18 Disaster Management Officer Confirm remote access capabilities with relevant officers Included in operational budgets Underway
officers.
Ensure at least three relevant flood related officers have
Include disaster management training on the agenda for
completed Queensland Local Disaster Management
Disaster Management Disaster preparations To be prepared for flood events 2016-18 Disaster Management Officer the Flood Working Group. Flood Working Group Included in operational budgets Scheduled
Guideline training or demonstrated a similar
maintains a record of training undertaken.
competency.
Ensure basic training has been provided to flooding
Include disaster management training on the agenda of
Disaster Management Disaster activation To be prepared for flood events related officers on the procedures to follow during a 2016-18 Disaster Management Officer Included in operational budgets Scheduled
Flood Working Group
flood event.
A community flood awareness program has been Coordinate funding through Disaster Management Get
Disaster Management Community awareness Disaster Management Officer
To improve community resilience 2016-18 Not started
prepared and delivered. Ready Program
Complete additional bathymetric survey of the Noosa
River to supplement existing survey to provide additional
Flood records and To understand existing and future Discuss with Flood Working Group a preferred time to
Flooding Resources reference for monitoring and understanding changes to 2016-18 Principal Strategic Planner $60000 budgeted 17/18 Not started
urvey flooding conditions do survey
the River’s bed profile and potential impact on flood
flow capacity and flow velocity distributions.
Collect peak flood level records along Kin Kin Creek for a Determine the appropriate rainfall and/or flood gauge
Flood records and To understand existing and future
Flooding Resources variety of flood events to improve flood model 2018-21 Asset Planning Coordinator height that would trigger collection of flood level Decision to be made in future budget deliberations Not started
urvey flooding conditions
calibration in this location. records along Kin Kin Creek.
Noosa Counc FMP mplementation Plan.xisx Page 3 of 4 13/07/2016
Page 9 of 41See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.