INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007
Operational work that is tidal work or |9. The application involves operational work that is: ( tick the applicable boxes)

tw “kin wo asta] management 8 istrict C1 (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed Sood bel work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF
local government tidal areas refer to oat , D1 (ii) tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1: 0F
Unt fed “none of the above’ to Q9, se . ere scart
tho appcation requis assessment by he. O (iii) carried out within a coastal management district under the Coastal Act and for - complete
Environmentat Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked. .
If an agency other than EPA is the assessment ” C1 {a) constructing or installing works in a watercourse between MHWS and HAT (ie.
Cae oreo a be aptcaion in other than those works in tidal water) Where the development has been determined not
falation to this matter. to be assessable against the Water Act 2000 ;
a government's the assessment manager £1) (b) constructing a canal’? intended to be connected to tidal waters;
for seri jal work. . oa .

apes (J (c)_ constructing an artificial waterway:

[@) reclaiming land under tidal water;
(e) disposing of dredge spoil or other solid waste material in tidal water;
Cf) _ interfering with quarry material on State coastal land above high-water mark;

(2) @) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark; .

(1(h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

C1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

Lx{iv) none of the above. .

 

Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es)

 

Hi tt information eter to Gulde 18. For (1 (i) tidal work! as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; or

te government “ areas a sou 2. C1 (ii) tidal work that is prescribed tidal work" - complete Pant P of Form 1: oF

Infess you answered “none of the above” to eee . we en :
Q10, ihe appicaton triggers referral to LD (ii) carried out within a coastal Management district's under the Coastal Act and for -
Queensland Transport {QT} (Maritime Safety , . ‘ . ees .
ig) as a concurrence agency. : Of efaposing of dredge spoil or other solid waste material in tidal water - complete Part
Locat government is the assessment manager om > .
{or all prescribed tidal work. [1 (b) reclaiming land under tidal water - complete Part M of Form 1; or

C1 (c) constructing a canal’, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;

[D4 (iv) none of the above.

 

 

Coastal management 11. The application involves: (tick the applicable box/es)
For more information refer to Guide 18. (1 (i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above” to work carried out completely or partly in a coastal management district's
Q11, the application requires assessment by the Ae . . . . cpa
Environmental Protection Agency (EPA). OO (ii) a material change of use assessable under a planning scheme involving building
If an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -
for the application, EPA i . . .
coneayenee agency for the apalcaton in + the construction of a new premises with a GFA" of at least 1000m?
relation to this matter. « the enlargement of the GFA of existing premises by more than 1000m?2

OO fii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

LI (iv) reconfiguring a lot!” assessable under schedule 8 of the IPA and in connection with
the construction of a canal!? - complete Part M of Form 1

Ay) none of the above

 

 

10 Tidal work is defined in sch 10 of the IPA. .

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.

12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coasta! Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local goverment tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protaction and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act. . :

16 GFA is defined in sch 1 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go lo the planning scheme against which the application is being assessed.

17 Under s117 of the Coasta! Protection and Management Act 1995, an ‘application for reconfiguration, where the reconfiguration is associated with the construction of an antificial waterway, must be
accompanied by the appication for the operational works to construct the artificial waterway.

Page 4

Used in these records

About this file

File size
3.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0545 - Preliminary Building Works assessable against the Planning Code [As Published].pdf · 3.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.