Council archive · source document
07/0545 - Preliminary Building Works assessable against the Planning Code [As Published] · 172007.545
INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refer to Guide 18. For
information about prescribed tidat work refer fo
Guide 24,
If you answered “YES” to 012, the application
Wiggers referral to the Port Authority.
“The Port Authority i isa concurrence agency if the
development is —
© within 200m of a shipping, channel or anentry
and exit shipping corridor for the port
© iwithin 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;
* within 1000m of a planned port facility
identified in a land use plan approved under
the Transpoit Infrastructire Act 1994,
In all olfier situation the Port Authority Isan
advice agency.
Marinas ~
For mofa information refer to Guide 18, For
information about whether’a marina is prescribed
tidal work refer to Guide 24. The local .
government is the, assessment manager for alt
prescribed tidal work,
If you ariswered "YES" to Q43, the application
triggers referral to Queenstand Fire and Rescue
, Service as an advice agency, -
12.
13.
(DAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve development below high water mark? and within the limits of a port
under the Transport Infrastructure Act 1994? :
BNO
(71 YES - complete Pat M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
Does the application involve operational work that is tidal work for a marina‘? with more than 6
vessel berths?
fano
oO YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
Tidal works in strategic port tand tidal
areas
For more information refer to Guide 18,
Unless you answered "NO’ to Q14, the relevant
Port Authority is the assessment manager for he
application and the Environmental tion
Agency (EPA) and Queensland Transport {QT)
are concurrence agencies for the application.
. Does the application involve tidal works within a strategic port land tidal area2°?
Ne)
(1 YES - complete Part M of Form 1
Does the application involve development in a heritage registered place as defined under the
Heritage 15.
For further information refer to Guide.19. Queensland Heritage Act 1992?
(f you answered “YES” to Q15, the application
triggers referral to the Queensland Heritage a NO
Council as concurrence agency for the 1 YES - complete Part C of Form 4
application.
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
For mare Information, inchuding a list of the
declared catchment areas within Queensland,
refer to Guide 13.
Unless you answered “none of the above” to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).
If an agency other than NRW js the assessment
manager for the application, NRW is a
concurrence agency for the application In
elation to this matter,
involves: (tick the applicable box/es}
C1 (i) reconfiguring a tot if any tot resulting from the reconfiguration is less than 16 hectares;
C1 (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
none of the above
ti)
18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina ls defined In the Transport Operations (Maritime Pottution) Regulation 1995,
20 Strategle port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0545 - Preliminary Building Works assessable against the Planning Code [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.