Council archive · source document
07/0806 - Preliminary Building Work assessable against the planning scheme [As Published] · 172007.806
INTEGRATED PLANNING ACT 1997
* Integration oftand use and public
transport |
For'more infermation eter to Qukia 23° ‘schedule
BAe IPA, & schadue Zo he Renulton,
IDAS Assagemant Checklist, Version 20, 2 April 2007
22, The application involves: (tick the appicable box/es)~
CO (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
C1 (i) reconfiguring 9 lot~
{2} on land that is completely or partly within a public transport corridor, and the
+" fotal number of lots increases;
(1 (b) on land that is completely or party within a future public transport corridor or
* an airport's public safety area;
(1 (c)__ ontend that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site araa is 5000m? or greater,
CI (@) _ for a residential purpose within the 25 ANEF contour for an airport;
Di (e) for a residential purpose resulting in 100 or more allotments.
C1 (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ji)
above, on land that—
(1 (2) _ is completely or partly within a public bansport condor or or a future public
transport corridor,
CJ (b)_, will resutt in work that encroaches into an airport's operational airspace.
(2 (iv) none of the above.
aay safety and efficiency * ~
For more inforristion fates fo Guida 22. schotula
Sot the BA 8 schedule 2 of te P-Reaulaton:
23. The application involves: ‘iotne appicable bos)
(0 @ a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
CD Gi reconfiguring a fot—
(6) on tend that is completely of partly within a future public transport corridor,
future reitway land or a railway tunnel easement,
(1) (b) on land that is within 400m of a Citytrain passenger railway station or a afuture
Citytrain paseenger railway station, and the total site area ls 5000m? or
‘greater;
Ci (e} on land that abuts rail comides land, commercial corridor land or future railway
land, and the total number of lots increases;
(O(a) on tand that abuts rail corridor land, commercial corridor land or future railway
land and en’easement abutting the corridor or future raltway tand is created;
(Ce) ontand that is completely or partly withiri 100m of, and abutting an approach
to, a railway level crossing, and the tote! number of lots increases;
11) fora residential purpose resulting in 100 ar more allotments.
CD (ii) operational work assessable against tha planning scheme, but nat associated with 3
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m, on land that—
C1 (a) Is compietely or partly within rail corridor land or commercial corridor tand, and
the work is not for rail transport infrastructure or other rail infrastructure;
{[] (b} is completely or partly within future railway land, or a railway tunnel easement;
CO (e) abuts rail corridor land, commercial corridor land or future railway fand, and
the work is within 25m of the railway boundary.
D3 tw) none of the above.
Moonie to Brisbane pipeline
For mora injormation rater 0 Schedule 2of the 1
Uniess.you angwered. “none of the abows", the -
the holder of:
24, The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/as)—
(1) a material change of use assessable against the planning scheme and nol associated
with reconfiguring a lot, and any structure or work will be located wheily or partly in the
easement.
C1 (i) reconfiguring a fot
C2 (i) operational work assessable against the planning scheme, that is ling excavation,
_ compaction, driting, boring or piling not asseciated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
Tl (iv) none of the above,
Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0806 - Preliminary Building Work assessable against the planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.