Skip to the record
Every meeting, every word.

Council archive · source document

07/0806 - Preliminary Building Work assessable against the planning scheme [As Published] · 172007.806

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
SEQ Regional Pian |

For ory hfostion tr schodle 2ot me
IP Regulation.

Rar to Choplr 2, pa SA md ceded {Oot
“the [btearod Planning Act 1997; and schedul

  

2.4 he Regu Provionsforroran oo

 

IDAS Assessment Checklist, Version 20, 2 April 2007

+20. The application involves (tick apptcable box/es) -

C1 (i) amaterial change of use of pramises -
(a) in a Major Development Area in the Uroan Footprint for -
C1] ()  anurban activity -
(01 Inan area included in a structure plan where the IPA, saction 3.1.6
applies;
(1 in an area not included in a structure plan where -

« the IPA, section 3.1.6 applies to the application for the material change
of use; oF

« the premises exceeds 10,000m2; or

« the gross floor area (GFA) on the premises will exceed 10,000m2; or

« impact assessment is required under the relevant planning scheme
CO (i) intensive animal husbandry, or

CO (i) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
01. 0 anurban activity and not apecified in section 2.4(2); or
1 (i) residential development involving a rural residential purpose and not
specified In section 2.6(2)
(¢) in the Rural Living Area for an urban activity and not spacified in section 2.8(2);
(d) in the Investigation Ares for -
CO (i) an urban activity and not specified in section n2. 10(2);
OC (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
CO (ill) intensive animal husbandry -
1 di reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint th that is:
{@) not included in a structure plan; and
(b) not specified in section 3.1(2).

.. A fii)none of the above

+ 121. The application involves: (tex the applicable box/es)

(Ai) an assessable material change of use for aquaculture - complete Part Ox of Form f;

C1 (i) assessable operational work that is the construction or raising of a waterway barrier -
complete Pad 0; of Form 1;

Oe (ii) assessable operational work completely or party within a declared fish habitat area
complete Part On of Form 1;

C1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Pat O af Form 1; . ,
Dy) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
. declared fish habitat area;

 

PR (vl) none of the above.

Poge7

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0806 - Preliminary Building Work assessable against the planning scheme [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.